BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3011086

Brooklyn property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 21, 2026, October 26, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Egress / Exit Obstruction

BoroughBrooklyn
BIN3011086
Block / Lot00736 / 0013
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 037035218N (source ECB number 37035218N). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39199615K
ACTIVE
October 21, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 AT TIME OF INSPECTION OBSERVED AT 1ST FLOOR MILLWORK SHOP EXIT DOOR TO THE BACK SEALED, EXIT PASSAGEWAY THRU EXPOSURE 2 OBSTRUCTED BY DEBRIS AND GARBAGE CART., REPAIR AND/REPLACE 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39199616M
ACTIVE
October 21, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 AT TIME OF INSPECTION OBSERVED AT 1ST FLOOR MILLWORK SHOP EXCESSIVE AMOUNT FLAMMABLE LIQUID STORED WITHOUT PROTECTION., MAINTAIN STORAGE IN COMPLIANCE WITH FIRE CODE 183 — BC 3303.4.6 & 27-1018 UNSAFE STORAGE OF COMBUSTIBLE MATERIAL AND EQUIPMENT
37035218N
ACTIVE
October 26, 2026
8:30 AM
CLASS - 2 PENDING $625.00 FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 30000111200N0001 IN ACCORDANCE WITH THE RULES OF THE DEPARTMENT. 1RCNY 103-01(D)(1) REQUIRES THAT AN ANNUAL INSPECTION REPORT FO 265 — 28-303.7 FAILURE TO FILE A COMPLETE BOILER INSPECTION REPORT.

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: Egress / Exit Obstruction; Other Building / Code Compliance; Boiler / HVAC / Service Equipment. The hearing dates are October 21, 2026, October 26, 2026; the source issue date(s) are August 6, 2026, May 28, 2025.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Egress / Exit Obstruction — Summons 39199615K

CLASS - 1 · Issued August 6, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED AT 1ST FLOOR MILLWORK SHOP EXIT DOOR TO THE BACK SEALED, EXIT PASSAGEWAY THRU EXPOSURE 2 OBSTRUCTED BY DEBRIS AND GARBAGE CART., REPAIR AND/REPLACE

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.

Hearing issues to verify

  • Was the cited passageway actually required egress for the affected occupancy?
  • Did the alleged obstruction exist when the inspector observed it?
  • Was the condition immediately removed and can the timing be documented?

Evidence that may matter

  • Dated photographs showing the exit path
  • Approved floor/egress plans
  • Building or security logs
  • Statements or work records documenting removal of stored items/obstructions

Other Building / Code Compliance — Summons 39199616M

CLASS - 1 · Issued August 6, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED AT 1ST FLOOR MILLWORK SHOP EXCESSIVE AMOUNT FLAMMABLE LIQUID STORED WITHOUT PROTECTION., MAINTAIN STORAGE IN COMPLIANCE WITH FIRE CODE

Cited provision(s): 183 — BC 3303.4.6 & 27-1018 UNSAFE STORAGE OF COMBUSTIBLE MATERIAL AND EQUIPMENT

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Boiler / HVAC / Service Equipment — Summons 37035218N

CLASS - 2 · Issued May 28, 2025; hearing October 26, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 30000111200N0001 IN ACCORDANCE WITH THE RULES OF THE DEPARTMENT. 1RCNY 103-01(D)(1) REQUIRES THAT AN ANNUAL INSPECTION REPORT FO

Cited provision(s): 265 — 28-303.7 FAILURE TO FILE A COMPLETE BOILER INSPECTION REPORT.

How this type of condition is typically resolved

Service-equipment charges usually require repair, safe shutdown or replacement of the cited equipment, together with any required inspection, testing, annual filing or device-status update.

Hearing issues to verify

  • Was the cited device in service at the time alleged?
  • Was the equipment already repaired, disconnected or removed?
  • Do required annual inspection / filing records show compliance for the relevant cycle?

Evidence that may matter

  • Licensed contractor maintenance/repair records
  • Inspection and testing results
  • Device-status or annual filing records
  • Utility/CO testing records and photographs where relevant

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.