BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3015900

Brooklyn property record with 4 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 28, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Other Building / Code Compliance

BoroughBrooklyn
BIN3015900
Block / Lot00850 / 0057
October Records4
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039558204H (source ECB number 39558204H). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39558203X
ACTIVE
October 28, 2026
10:30 AM
CLASS - 2 PENDING $2,500.00 . OBSERVED ACTIVE CONCRETE OPERATION @ SITE WITH AN INADEQUATE CONCRETE WASHOUT BOX. THE WASHOUT BOX WAS OBSERVED OVERFLOWING WITH CONCRETE AND CONCRETE-CONTAMINATED WATER, ALLOWING THE WASHOUT WATER TO DISCHAR 2F1 — BC 3303.15 FAIL TO PERFORM PROPER CONCRETE WASHOUT WATER PROCEDURES AT SITE
39558208P
ACTIVE
October 28, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 OBSERVED ACTIVE SITE WITH AN ON-GOING CONCRETE OPERATIONS. AFTER CHECKING DOB SYSTEM IT WAS DETERMINED THAT GC PERMIT ( B01072946-I1-GC) HAS EXPIRED ON 8/12/26.STOP ALL WORK. PROVIDE/MAINTAIN PERMIT 201 — 28-105.1 WORK WITHOUT A PERMIT
39558202Y
ACTIVE
October 28, 2026
9:30 AM
CLASS - 2 PENDING $2,400.00 . OBSERVED ACTIVE CONCRETE OPERATIONS TAKING PLACE WITHOUT PROVIDING REQUIRED FLAGMEN TO DIRECT AND CONTROL PEDESTRIAN TRAFFIC DURING CONCRETE OPERATIONS. NO FLAGMEN PUTS PEDESTRIAN IN DANGER OF CONCRETE OPERAT 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
39558204H
ACTIVE
October 28, 2026
9:30 AM
CLASS - 2 PENDING $2,500.00 . SITE FAILED TO MAINTAIN A SAFE AND ACCESSIBLE FORM OF EGRESS FOR WORKERS WHILE CONCRETE OPERATIONS WERE IN PROGRESS. THE LACK OF A MAINTAINED MEANS OF EGRESS CREATES A HAZARDOUS CONDITION PREVENTING WORKERS F 2P7

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: Other Building / Code Compliance; Work Without a Permit; Sidewalk Shed / Scaffold; Egress / Exit Obstruction. The hearing date is October 28, 2026; the source issue date(s) are August 20, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Other Building / Code Compliance — Summons 39558203X

CLASS - 2 · Issued August 20, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: . OBSERVED ACTIVE CONCRETE OPERATION @ SITE WITH AN INADEQUATE CONCRETE WASHOUT BOX. THE WASHOUT BOX WAS OBSERVED OVERFLOWING WITH CONCRETE AND CONCRETE-CONTAMINATED WATER, ALLOWING THE WASHOUT WATER TO DISCHAR

Cited provision(s): 2F1 — BC 3303.15 FAIL TO PERFORM PROPER CONCRETE WASHOUT WATER PROCEDURES AT SITE

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Work Without a Permit — Summons 39558208P

CLASS - 2 · Issued August 20, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED ACTIVE SITE WITH AN ON-GOING CONCRETE OPERATIONS. AFTER CHECKING DOB SYSTEM IT WAS DETERMINED THAT GC PERMIT ( B01072946-I1-GC) HAS EXPIRED ON 8/12/26.STOP ALL WORK. PROVIDE/MAINTAIN PERMIT

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Sidewalk Shed / Scaffold — Summons 39558202Y

CLASS - 2 · Issued August 20, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: . OBSERVED ACTIVE CONCRETE OPERATIONS TAKING PLACE WITHOUT PROVIDING REQUIRED FLAGMEN TO DIRECT AND CONTROL PEDESTRIAN TRAFFIC DURING CONCRETE OPERATIONS. NO FLAGMEN PUTS PEDESTRIAN IN DANGER OF CONCRETE OPERAT

Cited provision(s): 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Egress / Exit Obstruction — Summons 39558204H

CLASS - 2 · Issued August 20, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: . SITE FAILED TO MAINTAIN A SAFE AND ACCESSIBLE FORM OF EGRESS FOR WORKERS WHILE CONCRETE OPERATIONS WERE IN PROGRESS. THE LACK OF A MAINTAINED MEANS OF EGRESS CREATES A HAZARDOUS CONDITION PREVENTING WORKERS F

Cited provision(s): 2P7

How this type of condition is typically resolved

Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.

Hearing issues to verify

  • Was the cited passageway actually required egress for the affected occupancy?
  • Did the alleged obstruction exist when the inspector observed it?
  • Was the condition immediately removed and can the timing be documented?

Evidence that may matter

  • Dated photographs showing the exit path
  • Approved floor/egress plans
  • Building or security logs
  • Statements or work records documenting removal of stored items/obstructions

Case-specific next step

For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.