October 2026 NYC DOB / OATH Hearing — BIN 3018598

Brooklyn property record with 4 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 2, 2026, October 5, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBrooklyn
BIN3018598
Block / Lot00933 / 0028
October Records4
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039164521J (source ECB number 39164521J). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39164521J
ACTIVE
October 2, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 OBSERVE ENTIRE ROOF HAS BEEN REMOVED ON A 4-STORY BUILDING MIX-USE NFP THAT IS OCCUPIED WITH TENANTS. JOB# B01243905 WAS APPROVED ONLY AND NO PERMIT PULLED ATOI. STOP ALL ROOF WORK AND OBTAIN PERMIT., OBTAIN PE 101 — 28-105.1 WORK WITHOUT A PERMIT
39164546X
ACTIVE
October 2, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 OBSERVED TPP-B01274256-I1-01 POSTED UPON REVIEW OF TPP DOCUMENTS. OBSERVE MATERIAL BLOCKING HALLWAY ON THE 4 FLOORS TO APT 4F NOT AS PER SECTION EGRESS. NO FIRE EXTINGUISHER AS PER FIRE SAFETY SECTIONS. ALSO, N 106 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
39164547H
ACTIVE
October 2, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 OBSERVE WOOD JOIST HAVE BEEN SISTERS AT ROOF LEVEL CONTRARY TO APPROVED DOCUMENTS ON SITE UNDER JOB #B01274256-I2-GC., CONFORM WORK TO APPROVED CONSTRUCTION DOCUMENTS/AMENDMENTS; STOP ALL WORK UNDER JOB B012742 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
39186614X
ACTIVE
October 5, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. ATOI, OBSERVED THE ROOF CEILINGS JOISTS DO NOT CONFORM TO DOB APPROVED JOB APP #B01311487. NOTED JOISTS SISTERING METAL STRAP 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; Egress / Exit Obstruction. The hearing dates are October 2, 2026, October 5, 2026; the source issue date(s) are April 24, 2026, October 23, 2025.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39164521J

CLASS - 1 · Issued October 23, 2025; hearing October 2, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVE ENTIRE ROOF HAS BEEN REMOVED ON A 4-STORY BUILDING MIX-USE NFP THAT IS OCCUPIED WITH TENANTS. JOB# B01243905 WAS APPROVED ONLY AND NO PERMIT PULLED ATOI. STOP ALL ROOF WORK AND OBTAIN PERMIT., OBTAIN PE

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Egress / Exit Obstruction — Summons 39164546X

CLASS - 1 · Issued October 23, 2025; hearing October 2, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED TPP-B01274256-I1-01 POSTED UPON REVIEW OF TPP DOCUMENTS. OBSERVE MATERIAL BLOCKING HALLWAY ON THE 4 FLOORS TO APT 4F NOT AS PER SECTION EGRESS. NO FIRE EXTINGUISHER AS PER FIRE SAFETY SECTIONS. ALSO, N

Cited provision(s): 106 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS

How this type of condition is typically resolved

Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.

Hearing issues to verify

  • Was the cited passageway actually required egress for the affected occupancy?
  • Did the alleged obstruction exist when the inspector observed it?
  • Was the condition immediately removed and can the timing be documented?

Evidence that may matter

  • Dated photographs showing the exit path
  • Approved floor/egress plans
  • Building or security logs
  • Statements or work records documenting removal of stored items/obstructions

Work Without a Permit — Summons 39164547H

CLASS - 1 · Issued October 23, 2025; hearing October 2, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVE WOOD JOIST HAVE BEEN SISTERS AT ROOF LEVEL CONTRARY TO APPROVED DOCUMENTS ON SITE UNDER JOB #B01274256-I2-GC., CONFORM WORK TO APPROVED CONSTRUCTION DOCUMENTS/AMENDMENTS; STOP ALL WORK UNDER JOB B012742

Cited provision(s): 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39186614X

CLASS - 2 · Issued April 24, 2026; hearing October 5, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. ATOI, OBSERVED THE ROOF CEILINGS JOISTS DO NOT CONFORM TO DOB APPROVED JOB APP #B01311487. NOTED JOISTS SISTERING METAL STRAP

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.