October 2026 NYC DOB / OATH Hearing — BIN 3022729

Brooklyn property record with 6 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 21, 2026, October 28, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Site Safety / Safeguarding

BoroughBrooklyn
BIN3022729
Block / Lot01018 / 0067
October Records6
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039558041M (source ECB number 39558041M). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39558039N
ACTIVE
October 21, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE INSTALLED NEW WOOD JOISTS THROUGHOUT THE BUILDING, UPON REQUEST NO DESIGN DRAWINGS WAS PROVIDED (BC 3301.7) SITE FAILED TO PROVIDE APPROVE DRAWINGS FOR ALL STRU 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
39558040K
ACTIVE
October 21, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 AT THE TIME OF MY INSPECTION OBSERVED SITE FAILED TO PROVIDE TR1 REPORT FOR ALL ERECTED STEEL & WOOD JOISTS, STRUCTURE (3301.4). THE INSTALLATION OF MATERIAL SHALL BE PERFORM BY SPECIAL INSPECTION & RECORDS OF 1P7
39558041M
ACTIVE
October 21, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE FAILED TO PROVIDE MANUFACTURER SPECIFICATIONS FOR USE OF EXCAVATOR(BC 3301.1.3-2014 CODE)@ EXP. 3 REARYARD. UPON REQUEST NONE WAS PROVIDED. STOP ALL USE OF EXCA 1F1 — BC 3301.1.3 (2014 CODE) FAILURE TO COMPLY WITH MANUFACTURER SPECIFICATIONS
39558066Z
ACTIVE
October 28, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE FAILED TO INSTALL HANDRAILS BETWEEN 1ST FLOOR & CELLAR LEVEL( BC 3301.2 & 27-1009(A)) SITE FAILED TO INSURE ALL WORKERS INSPECTORS, EMT PERSONNEL HAVE SAFE WAY 120 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
39558146Z
ACTIVE
October 28, 2026
8:30 AM
CLASS - 1 PENDING $10,000.00 AT THE TIME OF MY INSPECTION OBSERVED GENERAL CONTRACTOR FAILED TO DESIGNATE SUPERINTENDENT FOR EXTENDED OF TIME.3301.13.3 UPON REVIEW LOGS WAS INADEQUATE,SITE SAFETY MANAGER FILLING OUT LOG BOOK FOR CS JOB UND 1G6 — BC 3301.13.3 FAILURE TO DESIGNATE AND/OR HAVE A CONSTRUCTION SUPERINTENDENT PRESENT
39558067K
ACTIVE
October 28, 2026
9:30 AM
CLASS - 1 PENDING $5,000.00 AT THE TIME OF MY INSPECTION ACTIVE SITE FAILED TO SUCCESSFULLY INSTALL GUARDRAILS(BC 3301.2 & 27-1009(A)-@ 1ST. FLOOR EXP. 3- SITE FAILED TO ADEQUATELY SAFEGUARD ALL ACTIVE WORKERS, INSPECTORS, EMT PERSONNEL-3 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 6 summons records for this property identifier. The charge mix is: 4 Site Safety / Safeguarding summonses; 2 Other Building / Code Compliance summonses. The hearing dates are October 21, 2026, October 28, 2026; the source issue date(s) are August 17, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Site Safety / Safeguarding — Summons 39558039N

CLASS - 1 · Issued August 17, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE INSTALLED NEW WOOD JOISTS THROUGHOUT THE BUILDING, UPON REQUEST NO DESIGN DRAWINGS WAS PROVIDED (BC 3301.7) SITE FAILED TO PROVIDE APPROVE DRAWINGS FOR ALL STRU

Cited provision(s): 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Other Building / Code Compliance — Summons 39558040K

CLASS - 1 · Issued August 17, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OBSERVED SITE FAILED TO PROVIDE TR1 REPORT FOR ALL ERECTED STEEL & WOOD JOISTS, STRUCTURE (3301.4). THE INSTALLATION OF MATERIAL SHALL BE PERFORM BY SPECIAL INSPECTION & RECORDS OF

Cited provision(s): 1P7

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Other Building / Code Compliance — Summons 39558041M

CLASS - 1 · Issued August 17, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE FAILED TO PROVIDE MANUFACTURER SPECIFICATIONS FOR USE OF EXCAVATOR(BC 3301.1.3-2014 CODE)@ EXP. 3 REARYARD. UPON REQUEST NONE WAS PROVIDED. STOP ALL USE OF EXCA

Cited provision(s): 1F1 — BC 3301.1.3 (2014 CODE) FAILURE TO COMPLY WITH MANUFACTURER SPECIFICATIONS

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Site Safety / Safeguarding — Summons 39558066Z

CLASS - 1 · Issued August 17, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE FAILED TO INSTALL HANDRAILS BETWEEN 1ST FLOOR & CELLAR LEVEL( BC 3301.2 & 27-1009(A)) SITE FAILED TO INSURE ALL WORKERS INSPECTORS, EMT PERSONNEL HAVE SAFE WAY

Cited provision(s): 120 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Site Safety / Safeguarding — Summons 39558146Z

CLASS - 1 · Issued August 17, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OBSERVED GENERAL CONTRACTOR FAILED TO DESIGNATE SUPERINTENDENT FOR EXTENDED OF TIME.3301.13.3 UPON REVIEW LOGS WAS INADEQUATE,SITE SAFETY MANAGER FILLING OUT LOG BOOK FOR CS JOB UND

Cited provision(s): 1G6 — BC 3301.13.3 FAILURE TO DESIGNATE AND/OR HAVE A CONSTRUCTION SUPERINTENDENT PRESENT

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Site Safety / Safeguarding — Summons 39558067K

CLASS - 1 · Issued August 17, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION ACTIVE SITE FAILED TO SUCCESSFULLY INSTALL GUARDRAILS(BC 3301.2 & 27-1009(A)-@ 1ST. FLOOR EXP. 3- SITE FAILED TO ADEQUATELY SAFEGUARD ALL ACTIVE WORKERS, INSPECTORS, EMT PERSONNEL-3

Cited provision(s): 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Case-specific next step

For this property, the first paid review should reconcile the 6 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.