Sidewalk Shed / Scaffold — Summons 39557900R
DOB allegation in the source extract: @ TIME OF INSPECTION, THE FOLLOWING REQUIRED DOCUMENTATION WERE NOT AVAILABLE ON SITE FOR REVIEW SUCH AS NO SSP, SWS DRAWINGS, PIPE SCAFFOLD DRAWINGS, REQUIRED COMPLETION LETTER FOR PIPE SCAFFOLD, NO INSPECTION
Cited provision(s): 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records