BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3023523

Brooklyn property record with 6 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 1, 2026, October 26, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBrooklyn
BIN3023523
Block / Lot01036 / 0033
October Records6
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039154208Y (source ECB number 39154208Y). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39154208Y
ACTIVE
October 1, 2026
9:00 AM
CLASS - 1 DEFAULT $2,530.00 OCCUPANCY CONTRARY TO C OF O OR BUILDINGS RECORDS. ATOI, OBSERVED FULL HEIGHT PARTITIONS ERECTED TO SUB-DIVIDE THE CELLAR. CREATING 3 PCS BATH AND OCCUPIED S.R.O. WITH SEPARATE KEY LOCKING DEVICE, BED, PERSONAL 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
39154209X
ACTIVE
October 1, 2026
9:00 AM
CLASS - 1 DEFAULT $2,530.00 WORK WITHOUT PERMIT. AT TIME OF INSPECTION, OBSERVED ILLEGAL PLUMBING WORK COMPLETED INSTALLING WATER, AND WASTE LINES FOR WASHER/DRYER, SLOP SINK, AND 3PCS. BATHROOM (SINK, TOILET, SHOWER) INSIDE THE CELLAR. N 101 — 28-105.1 WORK WITHOUT A PERMIT
39154211P
ACTIVE
October 1, 2026
9:00 AM
CLASS - 1 DEFAULT $2,530.00 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. AT TIME OF INSPECTION, OBSERVED IN THE CELLAR ON THE CEILINGS THROUGH LARGE OPENI 139 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN
39173796N
ACTIVE
October 26, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39154208Y.. AS OF 1/14/26.., FILE A CERTIFICATE 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
39173799Z
ACTIVE
October 26, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39154211P AS OF 1/14/26.., FILE A CERTIFICATE O 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
39173804Y
ACTIVE
October 26, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. FOR WORK WITHOUT A PERMIT FOR VIO#39154209X.., COMPLY WITH COMMISSIONER'S ORDER 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 6 summons records for this property identifier. The charge mix is: 2 Work Without a Permit summonses; 2 Certificate of Correction / Commissioner Order summonses; Illegal Occupancy / Conversion; Failure to Maintain. The hearing dates are October 1, 2026, October 26, 2026; the source issue date(s) are January 14, 2026, July 18, 2025.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Illegal Occupancy / Conversion — Summons 39154208Y

CLASS - 1 · Issued July 18, 2025; hearing October 1, 2026. · Hearing status: DEFAULT

DOB allegation in the source extract: OCCUPANCY CONTRARY TO C OF O OR BUILDINGS RECORDS. ATOI, OBSERVED FULL HEIGHT PARTITIONS ERECTED TO SUB-DIVIDE THE CELLAR. CREATING 3 PCS BATH AND OCCUPIED S.R.O. WITH SEPARATE KEY LOCKING DEVICE, BED, PERSONAL

Cited provision(s): 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Work Without a Permit — Summons 39154209X

CLASS - 1 · Issued July 18, 2025; hearing October 1, 2026. · Hearing status: DEFAULT

DOB allegation in the source extract: WORK WITHOUT PERMIT. AT TIME OF INSPECTION, OBSERVED ILLEGAL PLUMBING WORK COMPLETED INSTALLING WATER, AND WASTE LINES FOR WASHER/DRYER, SLOP SINK, AND 3PCS. BATHROOM (SINK, TOILET, SHOWER) INSIDE THE CELLAR. N

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Failure to Maintain — Summons 39154211P

CLASS - 1 · Issued July 18, 2025; hearing October 1, 2026. · Hearing status: DEFAULT

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. AT TIME OF INSPECTION, OBSERVED IN THE CELLAR ON THE CEILINGS THROUGH LARGE OPENI

Cited provision(s): 139 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Certificate of Correction / Commissioner Order — Summons 39173796N

CLASS - 2 · Issued January 14, 2026; hearing October 26, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39154208Y.. AS OF 1/14/26.., FILE A CERTIFICATE

Cited provision(s): 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB

How this type of condition is typically resolved

This charge focuses on failure to complete or document the DOB correction process for an earlier summons. The practical task is usually to identify the underlying summons, confirm that its physical condition was actually corrected, and complete the current DOB Certificate of Correction requirements with the supporting proof and any applicable civil-penalty documentation.

Hearing issues to verify

  • Was a Certificate of Correction already submitted or approved for the underlying summons before this charge was issued?
  • Does DOB's record identify the same underlying summons number and correction deadline described in this citation?
  • Was the physical condition actually corrected, and can that correction be tied to the cited condition rather than a different job or location?

Evidence that may matter

  • DOB NOW / AEU Certificate of Correction submission or approval record
  • Before-and-after photographs tied to the cited condition
  • Permits, inspection results, contractor receipts or professional statements supporting the correction
  • Proof of applicable DOB civil-penalty payment or waiver, if required

Certificate of Correction / Commissioner Order — Summons 39173799Z

CLASS - 2 · Issued January 14, 2026; hearing October 26, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39154211P AS OF 1/14/26.., FILE A CERTIFICATE O

Cited provision(s): 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB

How this type of condition is typically resolved

This charge focuses on failure to complete or document the DOB correction process for an earlier summons. The practical task is usually to identify the underlying summons, confirm that its physical condition was actually corrected, and complete the current DOB Certificate of Correction requirements with the supporting proof and any applicable civil-penalty documentation.

Hearing issues to verify

  • Was a Certificate of Correction already submitted or approved for the underlying summons before this charge was issued?
  • Does DOB's record identify the same underlying summons number and correction deadline described in this citation?
  • Was the physical condition actually corrected, and can that correction be tied to the cited condition rather than a different job or location?

Evidence that may matter

  • DOB NOW / AEU Certificate of Correction submission or approval record
  • Before-and-after photographs tied to the cited condition
  • Permits, inspection results, contractor receipts or professional statements supporting the correction
  • Proof of applicable DOB civil-penalty payment or waiver, if required

Work Without a Permit — Summons 39173804Y

CLASS - 1 · Issued January 14, 2026; hearing October 26, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. FOR WORK WITHOUT A PERMIT FOR VIO#39154209X.., COMPLY WITH COMMISSIONER'S ORDER

Cited provision(s): 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 6 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.