What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 6 summons records for this property identifier. The charge mix is: 2 Failure to Maintain summonses; 2 Work Without a Permit summonses; Other Building / Code Compliance; Illegal Occupancy / Conversion. The hearing dates are October 1, 2026, October 7, 2026; the source issue date(s) are July 23, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Other Building / Code Compliance — Summons 35729324K
CLASS - 1 · Issued July 23, 2026; hearing October 1, 2026. · Hearing status: PENDING
DOB allegation in the source extract: PERMANENT DWELLING USED/CONVERTED FOR OTHER THAN PERMENANT-RESIDENTIALPURPOSES.DEPARTMENT OF BUILDINGS RECORDS INDICATE BUILDING TO BE LEGALLY APPROVED AS A CLASS A MULTIPLE DWELLING.NOTE AT BASEMENT LEVEL OF T
Cited provision(s): 1E5 — AC 28-210.3 PERM.DWELLING OFFERED/USED/CONV TO OTHER THAN PERM.RESIDENTIAL PURPOSE; 1E6 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.3
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Illegal Occupancy / Conversion — Summons 35729351X
CLASS - 1 · Issued July 23, 2026; hearing October 7, 2026. · Hearing status: PENDING
DOB allegation in the source extract: OCCUPANCY CONTRARY TO THAT ALLOWED BY DEPARTMENT OF BUILDINGS RECORDS.ILLEGAL OCCUPANCY NOTED:AT BASEMENT PART OF TRIPLER APARTMENT HAS CONVERTED TO CLASS A APARTMENT WITH 2 BEDROOMS,3 PIECES BATHROOM(SHOWEER,T
Cited provision(s): 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
How this type of condition is typically resolved
The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.
Hearing issues to verify
- What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
- Did the inspector accurately identify how the space was being used on the cited date?
- Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
- Is there an approved filing or historical record supporting the present use?
Evidence that may matter
- Certificate of Occupancy / Schedule of Occupancy and approved plans
- Historic occupancy records, permits and prior approved layouts
- Dated photographs and floor plans
- Leases, tenant records or sworn statements concerning actual use
- Permits/inspection records if the condition was legalized or restored
Failure to Maintain — Summons 35729352H
CLASS - 1 · Issued July 23, 2026; hearing October 7, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.FAILURE TO PROVIDE A SYSTEM OF AUTOMATIC SPRINKLERS WERE REQUIRED AS PER BC 903.2 AND 27-954 FOR TRANSIENT USE AT BASEMENT APARTMENT.PREVIOUS VIOLATION#35
Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
How this type of condition is typically resolved
Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.
Hearing issues to verify
- Does the description accurately identify the component, location and condition?
- Was the condition already repaired or not present when the summons was issued?
- Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?
Evidence that may matter
- Dated before/after photographs
- Repair invoices and contractor statements
- Professional inspection/report when structural or technical conditions are involved
- Maintenance logs and prior inspection records
Work Without a Permit — Summons 35729353J
CLASS - 2 · Issued July 23, 2026; hearing October 7, 2026. · Hearing status: PENDING
DOB allegation in the source extract: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROVED AMENDMENTS.NOTED:AT BASEMENT LEVEL AT TIME OF INSPECTION OBSERVED KITCHEN CABINET WITH SINK INSTALLED IN FAMILY ROOM CONTRARY TO PLAN FIL
Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Failure to Maintain — Summons 35729354L
CLASS - 1 · Issued July 23, 2026; hearing October 7, 2026. · Hearing status: PENDING
DOB allegation in the source extract: BC 907.2.8 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.FAILURE TO PROVIDE CLASS J FIRE ALARM SYSTEM FOR THROUGHOUT USE AT BASEMENTAPARTMENT.PREVIOUS VIOLATION#35725634H,35725812L REM:DISCONTINUE ILLEG
Cited provision(s): 106 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
How this type of condition is typically resolved
Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.
Hearing issues to verify
- Does the description accurately identify the component, location and condition?
- Was the condition already repaired or not present when the summons was issued?
- Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?
Evidence that may matter
- Dated before/after photographs
- Repair invoices and contractor statements
- Professional inspection/report when structural or technical conditions are involved
- Maintenance logs and prior inspection records
Work Without a Permit — Summons 35729355N
CLASS - 2 · Issued July 23, 2026; hearing October 7, 2026. · Hearing status: PENDING
DOB allegation in the source extract: WORK WITHOUT A PERMIT.WORK NOTED INSTALLED WATER AND WASTE LIINES FOR KITCHEN SINK AT BASEMENT LEVEL.REM:OBTAIN PERMIT.
Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Case-specific next step
For this property, the first paid review should reconcile the 6 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.