BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3034796

Brooklyn property record with 2 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 28, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Electrical Work / Electrical Permit

BoroughBrooklyn
BIN3034796
Block / Lot01315 / 0010
October Records2
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039201581L (source ECB number 39201581L). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39201581L
ACTIVE
October 28, 2026
8:30 AM
CLASS - 1 PENDING $1,600.00 ATOI AT CELLAR OBSERVED SEVERAL OPEN ELECTRICAL PANELS/BOXES WITH EXPOSED LIVE WIRES, AT GAS METER ROOM, ABOVE ELEVATOR EXIT , AND IN HALLWAY. UNSAFE/UNAPPROVED ELECTRICAL EQUIPMENT AND WIRING OBSERVED IN USE. 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
39201582N
ACTIVE
October 28, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 ATOI OBSERVED AT EXPO #1, FAILURE TO MAINTAIN. EGRESS PATH OF FIRE ESCAPE. THERE ARE SCAFFOLDING , CROSS BARS , VACUME CLEANER AND SCREWJACKS ON GROUND OBSTRUCT EGRESS. KEEP EGRESS/DISCHARGE PATH CLEAR AT ALL T 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Electrical Work / Electrical Permit; Sidewalk Shed / Scaffold. The hearing date is October 28, 2026; the source issue date(s) are August 24, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Electrical Work / Electrical Permit — Summons 39201581L

CLASS - 1 · Issued August 24, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI AT CELLAR OBSERVED SEVERAL OPEN ELECTRICAL PANELS/BOXES WITH EXPOSED LIVE WIRES, AT GAS METER ROOM, ABOVE ELEVATOR EXIT , AND IN HALLWAY. UNSAFE/UNAPPROVED ELECTRICAL EQUIPMENT AND WIRING OBSERVED IN USE.

Cited provision(s): 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE

How this type of condition is typically resolved

Electrical charges generally require determining whether the cited installation was permitted and performed under the required licensed-electrical process, then correcting unsafe or unapproved work and obtaining any required inspection/acceptance.

Hearing issues to verify

  • Was there an active electrical application/permit covering the cited wiring or equipment?
  • Was the condition already corrected or disconnected before the inspection date?
  • Does the cited equipment/location match the permitted scope and electrical inspection record?

Evidence that may matter

  • Electrical permit/application and inspection records
  • Licensed electrician invoice, letter or work order
  • Photographs of wiring/equipment before and after correction
  • Testing, certification or utility documentation where relevant

Sidewalk Shed / Scaffold — Summons 39201582N

CLASS - 2 · Issued August 24, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED AT EXPO #1, FAILURE TO MAINTAIN. EGRESS PATH OF FIRE ESCAPE. THERE ARE SCAFFOLDING , CROSS BARS , VACUME CLEANER AND SCREWJACKS ON GROUND OBSTRUCT EGRESS. KEEP EGRESS/DISCHARGE PATH CLEAR AT ALL T

Cited provision(s): 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Case-specific next step

For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.