What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Elevator / Vertical Transportation; Work Without a Permit. The hearing dates are October 29, 2026, October 7, 2026; the source issue date(s) are January 5, 2026, July 27, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Elevator / Vertical Transportation — Summons 39197763N
CLASS - 1 · Issued July 27, 2026; hearing October 7, 2026. · Hearing status: PENDING
DOB allegation in the source extract: RTS CLASS 1: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. SERVICE ELEVATOR EQUIPMENT AS PER BC3001.2 & 27-987. UPON AN INSPECTION THE ELEVATOR IS FOUND OUT OF SERVICE, CREATING A HAZARDOUS CONDITION F
Cited provision(s): 151 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
How this type of condition is typically resolved
Elevator charges often require licensed-elevator maintenance or repair, the required periodic inspection/test filing, an affirmation of correction where applicable, and reinspection for hazardous conditions.
Hearing issues to verify
- Does the device number/location on the summons match the building's elevator record?
- Was the cited defect repaired or the device removed from service before the inspection?
- Were the required CAT/periodic inspection filings timely and accepted?
Evidence that may matter
- Elevator device record and inspection/test reports
- Maintenance contractor logs and repair tickets
- Affirmation of Correction / reinspection result
- Photographs or controller/service records
Work Without a Permit — Summons 39172370L
CLASS - 1 · Issued January 5, 2026; hearing October 29, 2026. · Hearing status: PENDING
DOB allegation in the source extract: WORK WITH-OUT PERMIT. AT TIME OF INSPECTION, OBSERVED MULTI DWELLING BUILDING, INTERIOR ALTERATION OF APT, 4C ALL PLUMBING FIXTURES REMOVED, NEW PLUMBING PIPING ROUGH-IN KITCHEN AND BATHROOM. NO PLUMBING PERMIT
Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.