October 2026 NYC DOB / OATH Hearing — BIN 3039078

Brooklyn property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 28, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Stop Work Order

BoroughBrooklyn
BIN3039078
Block / Lot01453 / 0011
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039200460K (source ECB number 39200460K). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39200401K
ACTIVE
October 28, 2026
10:30 AM
CLASS - 1 PENDING $5,000.00 AT TIME OF INSPECTION OBSERVED STOP WORK ORDER STICKER REMOVED AT THE FRONT DOOR WHICH WAS ISSUED ON 8/26/25., COMPLY WITH CODE 1F8 — 28-207.2.5 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER
39200460K
ACTIVE
October 28, 2026
10:30 AM
CLASS - 1 PENDING $10,000.00 ATOI OBSERVED SIDE YARD OF PROPERTY FULLY CONCRETED WHERE PREVIOUSLY WAS A MIXTURE OF DIRT AND GRAVEL WITH AN EXPOSED PVP PIPE PRESENT. NEW CONCRETE SIDE YARD STRIP IS APPROX 50FT LONG. NO PERMITS ON FILE WITH 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
39200402M
ACTIVE
October 28, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 AT TIME OF INSPECTION OBSERVED FIRE ESCAPE AT THE FRONT BUILDING OBSTRUCTED DUE TO A.C UNIT BLOCKING THE STAIRS IN THE PASSAGEWAY CREATING A HAZARD CONDITIONS WHEN EXITING THE BUILDING., REMOVE OBSTRUCTION 127 — 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: 2 Stop Work Order summonses; Egress / Exit Obstruction. The hearing date is October 28, 2026; the source issue date(s) are August 12, 2026, August 13, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Stop Work Order — Summons 39200401K

CLASS - 1 · Issued August 12, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED STOP WORK ORDER STICKER REMOVED AT THE FRONT DOOR WHICH WAS ISSUED ON 8/26/25., COMPLY WITH CODE

Cited provision(s): 1F8 — 28-207.2.5 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER

How this type of condition is typically resolved

An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.

Hearing issues to verify

  • What exact work was covered by the Stop Work Order: all work or only part of the project?
  • Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
  • Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?

Evidence that may matter

  • Copy of the Stop Work Order and any rescission/modification notice
  • DOB permit records and inspector correspondence
  • Daily logs, photographs and contractor records showing when work stopped or resumed
  • Evidence identifying any limited corrective/safety work performed

Stop Work Order — Summons 39200460K

CLASS - 1 · Issued August 13, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED SIDE YARD OF PROPERTY FULLY CONCRETED WHERE PREVIOUSLY WAS A MIXTURE OF DIRT AND GRAVEL WITH AN EXPOSED PVP PIPE PRESENT. NEW CONCRETE SIDE YARD STRIP IS APPROX 50FT LONG. NO PERMITS ON FILE WITH

Cited provision(s): 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

How this type of condition is typically resolved

An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.

Hearing issues to verify

  • What exact work was covered by the Stop Work Order: all work or only part of the project?
  • Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
  • Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?

Evidence that may matter

  • Copy of the Stop Work Order and any rescission/modification notice
  • DOB permit records and inspector correspondence
  • Daily logs, photographs and contractor records showing when work stopped or resumed
  • Evidence identifying any limited corrective/safety work performed

Egress / Exit Obstruction — Summons 39200402M

CLASS - 1 · Issued August 12, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED FIRE ESCAPE AT THE FRONT BUILDING OBSTRUCTED DUE TO A.C UNIT BLOCKING THE STAIRS IN THE PASSAGEWAY CREATING A HAZARD CONDITIONS WHEN EXITING THE BUILDING., REMOVE OBSTRUCTION

Cited provision(s): 127 — 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY

How this type of condition is typically resolved

Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.

Hearing issues to verify

  • Was the cited passageway actually required egress for the affected occupancy?
  • Did the alleged obstruction exist when the inspector observed it?
  • Was the condition immediately removed and can the timing be documented?

Evidence that may matter

  • Dated photographs showing the exit path
  • Approved floor/egress plans
  • Building or security logs
  • Statements or work records documenting removal of stored items/obstructions

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.