October 2026 NYC DOB / OATH Hearing — BIN 3039408

Brooklyn property record with 6 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 28, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBrooklyn
BIN3039408
Block / Lot01468 / 0029
October Records6
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039201003J (source ECB number 39201003J). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39201003J
ACTIVE
October 28, 2026
10:30 AM
CLASS - 2 PENDING $2,500.00 RESIDENCE CONVERTED MAINTAINED OR OCCUPIED AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED NUMBER OF FAMILIES AUTHORIZED BY THE C OF O OR OFFICIAL DEPARTMENT RECORDS. ATOI, C OF O #213445 INDICATES 3 FAMILY DW 2K6 — 28-210.1 RESIDENCE CONVERTED MAINTAINED OR OCCUPIED AS A DWELLING FOR MORE THAN
39201006P
ACTIVE
October 28, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. ATOI OF THE CELLAR LEVEL, I OBSERVED THE BOILER ROOM WITH MISSING FIRE STOPPING I 239 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN
39201004L
ACTIVE
October 28, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. AT THE TIME OF INSPECTION OF THE CELLAR LEVEL, I OBSERVED REAR EGRESS OBSTRUCTED WITH MISCELLANEOUS ITEMS AND A PIECE OF PLYWOOD ABOVE THE STEPS WITH MULTIPLE IT 127 — 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY
39201007R
ACTIVE
October 28, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 WORK WITHOUT A PERMIT. PLUMBING WORK NOTED. AT THE TIME OF INSPECTION OF THE CELLAR LEVEL, I OBSERVED A 3 PIECE BATHROOM AND A RESIDENTIAL SINK. THE WORK IS COMPLETED 100%, NO FILLINGS IN DOB RECORDS FOR THE WO 201 — 28-105.1 WORK WITHOUT A PERMIT
39201005N
ACTIVE
October 28, 2026
9:30 AM
CLASS - 3 PENDING $250.00 WORK WITHOUT PERMIT. ALTERATION WORK NOTED. AT THE TIME OF INSPECTION OF THE CELLAR LEVEL, I OBSERVED FULL HEIGHT PARTITION WALLS TO CREATE 2 SEPARATE ROOMS WITH DOORS. THE WORK IS COMPLETED 100%, NO FILLINGS I 301 — 28-105.1 WORK WITHOUT A PERMIT
39201008Z
ACTIVE
October 28, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 FAILURE TO MAINTAIN BUILDING AND ALL PARTS THEREOF IN A CODE-COMPLIANT MANNER. ATOI OF THE REAR OF THE BLDG, I OBSERVED A LANDING W/ STEP FROM THE 1FL TO THE REAR THAT IS INADEQUATELY SUPPORTED WITH A 2X4 & WOO 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 6 summons records for this property identifier. The charge mix is: 2 Work Without a Permit summonses; Illegal Occupancy / Conversion; Boiler / HVAC / Service Equipment; Egress / Exit Obstruction; Failure to Maintain. The hearing date is October 28, 2026; the source issue date(s) are August 18, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Illegal Occupancy / Conversion — Summons 39201003J

CLASS - 2 · Issued August 18, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: RESIDENCE CONVERTED MAINTAINED OR OCCUPIED AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED NUMBER OF FAMILIES AUTHORIZED BY THE C OF O OR OFFICIAL DEPARTMENT RECORDS. ATOI, C OF O #213445 INDICATES 3 FAMILY DW

Cited provision(s): 2K6 — 28-210.1 RESIDENCE CONVERTED MAINTAINED OR OCCUPIED AS A DWELLING FOR MORE THAN

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Boiler / HVAC / Service Equipment — Summons 39201006P

CLASS - 2 · Issued August 18, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. ATOI OF THE CELLAR LEVEL, I OBSERVED THE BOILER ROOM WITH MISSING FIRE STOPPING I

Cited provision(s): 239 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN

How this type of condition is typically resolved

Service-equipment charges usually require repair, safe shutdown or replacement of the cited equipment, together with any required inspection, testing, annual filing or device-status update.

Hearing issues to verify

  • Was the cited device in service at the time alleged?
  • Was the equipment already repaired, disconnected or removed?
  • Do required annual inspection / filing records show compliance for the relevant cycle?

Evidence that may matter

  • Licensed contractor maintenance/repair records
  • Inspection and testing results
  • Device-status or annual filing records
  • Utility/CO testing records and photographs where relevant

Egress / Exit Obstruction — Summons 39201004L

CLASS - 1 · Issued August 18, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. AT THE TIME OF INSPECTION OF THE CELLAR LEVEL, I OBSERVED REAR EGRESS OBSTRUCTED WITH MISCELLANEOUS ITEMS AND A PIECE OF PLYWOOD ABOVE THE STEPS WITH MULTIPLE IT

Cited provision(s): 127 — 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY

How this type of condition is typically resolved

Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.

Hearing issues to verify

  • Was the cited passageway actually required egress for the affected occupancy?
  • Did the alleged obstruction exist when the inspector observed it?
  • Was the condition immediately removed and can the timing be documented?

Evidence that may matter

  • Dated photographs showing the exit path
  • Approved floor/egress plans
  • Building or security logs
  • Statements or work records documenting removal of stored items/obstructions

Work Without a Permit — Summons 39201007R

CLASS - 2 · Issued August 18, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. PLUMBING WORK NOTED. AT THE TIME OF INSPECTION OF THE CELLAR LEVEL, I OBSERVED A 3 PIECE BATHROOM AND A RESIDENTIAL SINK. THE WORK IS COMPLETED 100%, NO FILLINGS IN DOB RECORDS FOR THE WO

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39201005N

CLASS - 3 · Issued August 18, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT PERMIT. ALTERATION WORK NOTED. AT THE TIME OF INSPECTION OF THE CELLAR LEVEL, I OBSERVED FULL HEIGHT PARTITION WALLS TO CREATE 2 SEPARATE ROOMS WITH DOORS. THE WORK IS COMPLETED 100%, NO FILLINGS I

Cited provision(s): 301 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Failure to Maintain — Summons 39201008Z

CLASS - 2 · Issued August 18, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING AND ALL PARTS THEREOF IN A CODE-COMPLIANT MANNER. ATOI OF THE REAR OF THE BLDG, I OBSERVED A LANDING W/ STEP FROM THE 1FL TO THE REAR THAT IS INADEQUATELY SUPPORTED WITH A 2X4 & WOO

Cited provision(s): 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Case-specific next step

For this property, the first paid review should reconcile the 6 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.