BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3041333

Brooklyn property record with 2 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 28, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Failure to Maintain

BoroughBrooklyn
BIN3041333
Block / Lot01521 / 0039
October Records2
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039201383K (source ECB number 39201383K). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39201383K
ACTIVE
October 28, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN BUILDING AND ALL PARTS THEREOF IN A CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, I OBSERVED DEFECTS ON THE CORNICE ON MARION STREET AND ROCKAWAY AVENUE. MULTIPLE WOOD PIECES HAVE ALREAD 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39201384M
ACTIVE
October 28, 2026
8:30 AM
CLASS - 3 PENDING $500.00 MISCELLANEOUS VIOLATIONS. PC 1101.2 WHERE REQUIRED. FAILURE TO COMPLY WITH STORM/RAINWATER DRAINAGE REQUIREMENT FOR ROOF, PAVED AREA OR YARD. AT THE TIME OF THE INSPECTION, I OBSERVED THE LEADER AT THE EXTERIOR 380 — PC MISCFGC-MISCMC-MIS MISCELLANEOUS VIOLATIONS

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Failure to Maintain; Plumbing / Gas. The hearing date is October 28, 2026; the source issue date(s) are August 21, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Failure to Maintain — Summons 39201383K

CLASS - 1 · Issued August 21, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING AND ALL PARTS THEREOF IN A CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, I OBSERVED DEFECTS ON THE CORNICE ON MARION STREET AND ROCKAWAY AVENUE. MULTIPLE WOOD PIECES HAVE ALREAD

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Plumbing / Gas — Summons 39201384M

CLASS - 3 · Issued August 21, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: MISCELLANEOUS VIOLATIONS. PC 1101.2 WHERE REQUIRED. FAILURE TO COMPLY WITH STORM/RAINWATER DRAINAGE REQUIREMENT FOR ROOF, PAVED AREA OR YARD. AT THE TIME OF THE INSPECTION, I OBSERVED THE LEADER AT THE EXTERIOR

Cited provision(s): 380 — PC MISCFGC-MISCMC-MIS MISCELLANEOUS VIOLATIONS

How this type of condition is typically resolved

Plumbing/gas matters typically require determining whether the work was permitted and performed by the required licensed trade, correcting unsafe or unapproved conditions, and completing inspections/sign-off.

Hearing issues to verify

  • Was there a valid plumbing/gas filing covering the cited scope?
  • Did the condition predate the respondent's work or ownership?
  • Was the cited installation already disconnected or corrected?

Evidence that may matter

  • Licensed Master Plumber permit / filing records
  • Pressure-test / inspection / utility records
  • Invoices and plumber statements
  • Photographs showing the installation and correction

Case-specific next step

For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.