BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3044798

Brooklyn property record with 6 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 7, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Other Building / Code Compliance

BoroughBrooklyn
BIN3044798
Block / Lot01639 / 0035
October Records6
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039188294P (source ECB number 39188294P). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39188205Y
ACTIVE
October 7, 2026
8:30 AM
CLASS - 1 PENDING $4,800.00 ATOI, OBSERVED SIDEWALK SHED INSTALLED AT 536 MONROE STREET, UPON REVIEW OF APPROVED SHED DRAWINGS #B01185581, WORK DOES NOT CONFORM WITH APPROVED PLANS. SW SHED NOT INSTALLED AT EXPO 1 FRONT SIDEWALK AND REAR 1E7 — BC3307.3 FAILURE TO PROVIDE PEDESTRAIN PROTECTION FOR SIDEWALKS AND WALKWAYS
39188206X
ACTIVE
October 7, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 ATOI OBSERVED BUILDING PARTIALLY DEMOED, ROOF AND THIRD FLOOR EXTERIOR WALLS REMOVED, NO FALL PROTECTION PROVIDED, 5 WORKERS ON THE FLOOR AND NO GUARDRAILS INSTALLED AROUND THE PERIMETER FOR EXPOSURES 1,3,AND 4 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
39188207H
ACTIVE
October 7, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 ATOI, OBSERVED FAILURE TO MAINTAIN HOUSEKEEPING DURING CONSTRUCTION. EXCESSIVE DEBRIS AT SEVERAL LOCATIONS AT 2ND FLOOR AND EXPOSURE 3 LOCATION OVERLOADED WITH DEMOED BRICKS, MAINTAIN ADEQUATE CONSTRUCTION HOUS 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS
39188208J
ACTIVE
October 7, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 ATOI, OBSERVED BUILDING PARTIALLY DEMOLISHED 3RD FLOOR & ROOF REMOVED. UPON REVIEW OF FLOOR PLANS. ALL FLOORS MISSING PROPER SHORING TO SUPPORT OVERLOADED FLOOR WITH 5 WORKERS AND MATERIALS/DEBRIS, PLAN INDICAT 1P7
39188294P
ACTIVE
October 7, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 ATOI OBSERVED BUILDING BEING PARTIALLY DEMOLISH , ROOF AND 3RD FL REMOVED , AT PARTY WALL EXPOSURE 2, OBSERVED WORKERS APPLY STUCCO CEMENT ON WALL WEHERE WATERPROOFING MATERIALS REQUIERED BY CODE , PROVIDE APPR 1P7
39188295R
ACTIVE
October 7, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 ATOI OBSERVED BREACHED EXPOSED PARTY WALL AND WALL ANCHORS NOT BEND OVER AS REQUIRED BY CODE; 3309.8, COMPLY WITH CODE; APPLY WALL FINISHES AND ANCHORAGE AS REQUIRED BY CODE COMPLY WITH BC3309.8 1P7

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 6 summons records for this property identifier. The charge mix is: 2 Other Building / Code Compliance summonses; Sidewalk Shed / Scaffold; Façade / Exterior Wall; Failure to Maintain; Elevator / Vertical Transportation. The hearing date is October 7, 2026; the source issue date(s) are May 11, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Sidewalk Shed / Scaffold — Summons 39188205Y

CLASS - 1 · Issued May 11, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI, OBSERVED SIDEWALK SHED INSTALLED AT 536 MONROE STREET, UPON REVIEW OF APPROVED SHED DRAWINGS #B01185581, WORK DOES NOT CONFORM WITH APPROVED PLANS. SW SHED NOT INSTALLED AT EXPO 1 FRONT SIDEWALK AND REAR

Cited provision(s): 1E7 — BC3307.3 FAILURE TO PROVIDE PEDESTRAIN PROTECTION FOR SIDEWALKS AND WALKWAYS

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Façade / Exterior Wall — Summons 39188206X

CLASS - 1 · Issued May 11, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED BUILDING PARTIALLY DEMOED, ROOF AND THIRD FLOOR EXTERIOR WALLS REMOVED, NO FALL PROTECTION PROVIDED, 5 WORKERS ON THE FLOOR AND NO GUARDRAILS INSTALLED AROUND THE PERIMETER FOR EXPOSURES 1,3,AND 4

Cited provision(s): 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY

How this type of condition is typically resolved

Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.

Hearing issues to verify

  • Does the inspector's description match the actual exposure, floor and defect?
  • Was the condition already repaired or protected before the summons date?
  • Was there a current FISP/QEWI filing addressing the same condition?

Evidence that may matter

  • QEWI report, FISP filing or amended report
  • Close-up and elevation photographs identifying the exact defect
  • Repair proposals, invoices and completion records
  • Engineer/architect letter and inspection documentation

Failure to Maintain — Summons 39188207H

CLASS - 1 · Issued May 11, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI, OBSERVED FAILURE TO MAINTAIN HOUSEKEEPING DURING CONSTRUCTION. EXCESSIVE DEBRIS AT SEVERAL LOCATIONS AT 2ND FLOOR AND EXPOSURE 3 LOCATION OVERLOADED WITH DEMOED BRICKS, MAINTAIN ADEQUATE CONSTRUCTION HOUS

Cited provision(s): 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Elevator / Vertical Transportation — Summons 39188208J

CLASS - 1 · Issued May 11, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI, OBSERVED BUILDING PARTIALLY DEMOLISHED 3RD FLOOR & ROOF REMOVED. UPON REVIEW OF FLOOR PLANS. ALL FLOORS MISSING PROPER SHORING TO SUPPORT OVERLOADED FLOOR WITH 5 WORKERS AND MATERIALS/DEBRIS, PLAN INDICAT

Cited provision(s): 1P7

How this type of condition is typically resolved

Elevator charges often require licensed-elevator maintenance or repair, the required periodic inspection/test filing, an affirmation of correction where applicable, and reinspection for hazardous conditions.

Hearing issues to verify

  • Does the device number/location on the summons match the building's elevator record?
  • Was the cited defect repaired or the device removed from service before the inspection?
  • Were the required CAT/periodic inspection filings timely and accepted?

Evidence that may matter

  • Elevator device record and inspection/test reports
  • Maintenance contractor logs and repair tickets
  • Affirmation of Correction / reinspection result
  • Photographs or controller/service records

Other Building / Code Compliance — Summons 39188294P

CLASS - 1 · Issued May 11, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED BUILDING BEING PARTIALLY DEMOLISH , ROOF AND 3RD FL REMOVED , AT PARTY WALL EXPOSURE 2, OBSERVED WORKERS APPLY STUCCO CEMENT ON WALL WEHERE WATERPROOFING MATERIALS REQUIERED BY CODE , PROVIDE APPR

Cited provision(s): 1P7

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Other Building / Code Compliance — Summons 39188295R

CLASS - 1 · Issued May 11, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED BREACHED EXPOSED PARTY WALL AND WALL ANCHORS NOT BEND OVER AS REQUIRED BY CODE; 3309.8, COMPLY WITH CODE; APPLY WALL FINISHES AND ANCHORAGE AS REQUIRED BY CODE COMPLY WITH BC3309.8

Cited provision(s): 1P7

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Case-specific next step

For this property, the first paid review should reconcile the 6 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.