BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3048176

Brooklyn property record with 5 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 7, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Site Safety / Safeguarding

BoroughBrooklyn
BIN3048176
Block / Lot01709 / 0019
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039556991R (source ECB number 39556991R). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39556987Y
ACTIVE
October 7, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 OBSERVED ACTIVE CONSTRUCTION SITE UP TO 4FL DECK, WHEN I REQUESTED FOR SITE SAFETY PLANS AND COLD FORM STEEL TR1 INSPECTIONS, NONE WAS PROVIDED. CREATING AN IMMEDIATE DANGER BY NOT PROVIDING THE NECESSARY INSPE 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
39556990P
ACTIVE
October 7, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 OBSERVED CFS WITH HOLLOW C-JOISTS WITH PENETRATIONS INCLUDING THE BLOCKING. UPON REVIEW ON THE APPROVED STRUCTURAL PLANS IT SHOWS SOLID BLOCKING AT ENDS IS REQUIRED. PLANS DON'T SHOW C-JOIST AND BLOCKING PENETR 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
39556988X
ACTIVE
October 7, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 OBSERVED ACCUMULATION OF COMBUSTIBLE DEBRIS, MATERIALS, GARBAGE & UNSECURED POWER TOOLS AT LEADING EDGES, ON SIDEWALK SHED DECK, AT EXP#3 AND ON THE ROOFS OF NEIGHBORING PROPERTIES. CREATING TRIP AND FALL, STRU 212 — BC 3303.4,27-1018 FAIL TO MAINTAIN ADEQUATE HSEKEEPING PER SECTIONS REQUIREMENTS
39556991R
ACTIVE
October 7, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 OBSERVED INADEQUATE GUARDRAILS ON MULTIPLE FLOORS WITH COMPLETELY UNPROTECTED OPENINGS AT 2FL&4FL, MISSING TOEBOARDS , MID RAILS, POSTS AND NOT BEING SECURED LEANING DOWN AND HAVING MATERIALS STORED ON THEM. CR 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
39556989H
ACTIVE
October 7, 2026
9:30 AM
CLASS - 2 PENDING $2,500.00 OBSERVED CONSTRUCTION ON 4FL DECK WITH MATERIALS STORED ON TOP, ACCUMULATIONS OF CONSTRUCTION DEBRIS AND MATERIALS FALLING ON NEIGHBORING PROPERTIES ROOF AND SOLAR PANELS WITHOUT ANY ROOF PROTECTION. ENDANGERIN 2P4

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 2 Site Safety / Safeguarding summonses; Work Without a Permit; Sidewalk Shed / Scaffold; Other Building / Code Compliance. The hearing date is October 7, 2026; the source issue date(s) are July 23, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Site Safety / Safeguarding — Summons 39556987Y

CLASS - 2 · Issued July 23, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED ACTIVE CONSTRUCTION SITE UP TO 4FL DECK, WHEN I REQUESTED FOR SITE SAFETY PLANS AND COLD FORM STEEL TR1 INSPECTIONS, NONE WAS PROVIDED. CREATING AN IMMEDIATE DANGER BY NOT PROVIDING THE NECESSARY INSPE

Cited provision(s): 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Work Without a Permit — Summons 39556990P

CLASS - 2 · Issued July 23, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED CFS WITH HOLLOW C-JOISTS WITH PENETRATIONS INCLUDING THE BLOCKING. UPON REVIEW ON THE APPROVED STRUCTURAL PLANS IT SHOWS SOLID BLOCKING AT ENDS IS REQUIRED. PLANS DON'T SHOW C-JOIST AND BLOCKING PENETR

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Sidewalk Shed / Scaffold — Summons 39556988X

CLASS - 2 · Issued July 23, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED ACCUMULATION OF COMBUSTIBLE DEBRIS, MATERIALS, GARBAGE & UNSECURED POWER TOOLS AT LEADING EDGES, ON SIDEWALK SHED DECK, AT EXP#3 AND ON THE ROOFS OF NEIGHBORING PROPERTIES. CREATING TRIP AND FALL, STRU

Cited provision(s): 212 — BC 3303.4,27-1018 FAIL TO MAINTAIN ADEQUATE HSEKEEPING PER SECTIONS REQUIREMENTS

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Site Safety / Safeguarding — Summons 39556991R

CLASS - 1 · Issued July 23, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED INADEQUATE GUARDRAILS ON MULTIPLE FLOORS WITH COMPLETELY UNPROTECTED OPENINGS AT 2FL&4FL, MISSING TOEBOARDS , MID RAILS, POSTS AND NOT BEING SECURED LEANING DOWN AND HAVING MATERIALS STORED ON THEM. CR

Cited provision(s): 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Other Building / Code Compliance — Summons 39556989H

CLASS - 2 · Issued July 23, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED CONSTRUCTION ON 4FL DECK WITH MATERIALS STORED ON TOP, ACCUMULATIONS OF CONSTRUCTION DEBRIS AND MATERIALS FALLING ON NEIGHBORING PROPERTIES ROOF AND SOLAR PANELS WITHOUT ANY ROOF PROTECTION. ENDANGERIN

Cited provision(s): 2P4

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.