What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 2 Stop Work Order summonses; Failure to Maintain; Work Without a Permit. The hearing date is October 28, 2026; the source issue date(s) are August 14, 2026, August 18, 2026, August 20, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Stop Work Order — Summons 39200951P
CLASS - 1 · Issued August 18, 2026; hearing October 28, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FULL VACATE ORDER IN EFFECT FOR THIS PROPERTY. PSWO IN EFFECT FOR WORK NOT IN CONFORMANCE WITH APPROVED PLANS UNDER PERMIT #B01202580 EXP. 11/18/2026. ATOI, ADDITIONAL FRAMING WORK OBSERVED ON THIRD FLR, INCLUD
Cited provision(s): 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
How this type of condition is typically resolved
An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.
Hearing issues to verify
- What exact work was covered by the Stop Work Order: all work or only part of the project?
- Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
- Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?
Evidence that may matter
- Copy of the Stop Work Order and any rescission/modification notice
- DOB permit records and inspector correspondence
- Daily logs, photographs and contractor records showing when work stopped or resumed
- Evidence identifying any limited corrective/safety work performed
Stop Work Order — Summons 39201230J
CLASS - 1 · Issued August 20, 2026; hearing October 28, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FULL VACATE ORDER & PARTIAL STOP WORK ORDER IN EFFECT ON THIS PROPERTY. ATOI, ADDITIONAL FRAMING WORK OBSERVED ON REAR & ROOF OF THIRD FLOOR AT EXPOS.3 & 4, CONTRARY TO SWO #3A76023B ISSUED ON 08/14/2026. VIOLA
Cited provision(s): 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
How this type of condition is typically resolved
An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.
Hearing issues to verify
- What exact work was covered by the Stop Work Order: all work or only part of the project?
- Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
- Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?
Evidence that may matter
- Copy of the Stop Work Order and any rescission/modification notice
- DOB permit records and inspector correspondence
- Daily logs, photographs and contractor records showing when work stopped or resumed
- Evidence identifying any limited corrective/safety work performed
Failure to Maintain — Summons 39200768R
CLASS - 2 · Issued August 14, 2026; hearing October 28, 2026. · Hearing status: PENDING
DOB allegation in the source extract: ATOI NO FALL PROTECTION OBSERVED ON THIRD FLOOR AT EXPO.3 POSING POTENTIAL HAZARD. VIOLATION ISSUED FOR FTM., REPAIR AND/OR REPLACE
Cited provision(s): 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
How this type of condition is typically resolved
Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.
Hearing issues to verify
- Does the description accurately identify the component, location and condition?
- Was the condition already repaired or not present when the summons was issued?
- Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?
Evidence that may matter
- Dated before/after photographs
- Repair invoices and contractor statements
- Professional inspection/report when structural or technical conditions are involved
- Maintenance logs and prior inspection records
Work Without a Permit — Summons 39200769Z
CLASS - 2 · Issued August 14, 2026; hearing October 28, 2026. · Hearing status: PENDING
DOB allegation in the source extract: ATOI OBSERVED LAYOUT AND FRAMING WORK ON THIRD FLOOR OF BUILDING DOES NOT CONFORM TO APPROVED PLANS ON FILE. PSWO ISSUED., CONFORM WORK TO APPROVED CONSTRUCTION DOCUMENTS/AMENDMENTS
Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Case-specific next step
For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.