BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3051572

Brooklyn property record with 4 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 7, 2026, October 14, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Sidewalk Shed / Scaffold

BoroughBrooklyn
BIN3051572
Block / Lot01822 / 0049
October Records4
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039557166L (source ECB number 39557166L). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557168P
ACTIVE
October 7, 2026
10:30 AM
CLASS - 2 PENDING $2,400.00 UPON INSPECTION I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1 INSTALLED CONTRARY TO CODE. 8FT MIN HEIGHT REQUIREMENT NOT MAINTAINED INFRONT OF ADJOINING PROPERTY AT EXPOS 2 CONTRARY TO CODE 3307.6.4.7. DRIVEW 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
39557169R
ACTIVE
October 7, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 I OBSERVED A SIDEWALK SHED NOT MAINTAINED AND BEING USED IN SAFE CONDITION CONTRARY TO CODE 3307.6.5.1 SAFE CONDITION. MULTIPLE ROTTED MUDSILLS. LARGE ROLLING GATE UNSAFELY ATTACHED TO SHED CREATING A POTENTIAL 1P7
39557166L
ACTIVE
October 7, 2026
9:30 AM
CLASS - 2 PENDING $2,500.00 UPON INSPECTION OF A NON-ACTIVE 4 STORY ALT CONSTRUCTION SITE I OBSERVED A FENCE INSTALLED AT EXPOSURE 1 THAT DID NOT FULLY ENCLOSE ON GOING CONSTRUCTION WORK AND POTENTIAL HAZARDS CONTRARY TO CODE 3307.7 FENCE 2P7
39199107Y
ACTIVE
October 14, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 ATOI OBSERVED AT EXPOSURE 1 OF CONSTRUCTION SITE, FULLY ERECTED SIDEWALK SHED UNDER APPLICATION#B00981725 EXP DATE 07/02/2026. NOV ISSUED FOR EXPIRED TEMPORARY EQUIPMENT., RENEW PERMIT; RENEW PERMIT 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 4 Sidewalk Shed / Scaffold summonses. The hearing dates are October 14, 2026, October 7, 2026; the source issue date(s) are August 4, 2026, July 28, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Sidewalk Shed / Scaffold — Summons 39557168P

CLASS - 2 · Issued July 28, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UPON INSPECTION I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1 INSTALLED CONTRARY TO CODE. 8FT MIN HEIGHT REQUIREMENT NOT MAINTAINED INFRONT OF ADJOINING PROPERTY AT EXPOS 2 CONTRARY TO CODE 3307.6.4.7. DRIVEW

Cited provision(s): 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Sidewalk Shed / Scaffold — Summons 39557169R

CLASS - 1 · Issued July 28, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: I OBSERVED A SIDEWALK SHED NOT MAINTAINED AND BEING USED IN SAFE CONDITION CONTRARY TO CODE 3307.6.5.1 SAFE CONDITION. MULTIPLE ROTTED MUDSILLS. LARGE ROLLING GATE UNSAFELY ATTACHED TO SHED CREATING A POTENTIAL

Cited provision(s): 1P7

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Sidewalk Shed / Scaffold — Summons 39557166L

CLASS - 2 · Issued July 28, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UPON INSPECTION OF A NON-ACTIVE 4 STORY ALT CONSTRUCTION SITE I OBSERVED A FENCE INSTALLED AT EXPOSURE 1 THAT DID NOT FULLY ENCLOSE ON GOING CONSTRUCTION WORK AND POTENTIAL HAZARDS CONTRARY TO CODE 3307.7 FENCE

Cited provision(s): 2P7

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Sidewalk Shed / Scaffold — Summons 39199107Y

CLASS - 2 · Issued August 4, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED AT EXPOSURE 1 OF CONSTRUCTION SITE, FULLY ERECTED SIDEWALK SHED UNDER APPLICATION#B00981725 EXP DATE 07/02/2026. NOV ISSUED FOR EXPIRED TEMPORARY EQUIPMENT., RENEW PERMIT; RENEW PERMIT

Cited provision(s): 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Case-specific next step

For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.