BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3056061

Brooklyn property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 28, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBrooklyn
BIN3056061
Block / Lot01963 / 0025
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039201053H (source ECB number 39201053H). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39201053H
ACTIVE
October 28, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 ELECTRICAL WORK WITHOUT A PERMIT. OBSERVED TEMP ELECTRICAL PANEL INSTALLED AT ROOF FOR SUSPENDED SCAFFOLD WITHOUT PERMITS FILED WITH DOB. PSWO# OP-71-26-11117, OBTAIN PERMIT 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
39201045H
ACTIVE
October 28, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 FAILURE TO POST OR DISTRIBUTE "SAFE CONSTRUCTION BILL OF RIGHTS. PER 27-2009.2 LOCAL LAW 159 OF 2017 FOR JOB#B01309417-I1-GC, POST OR DISTRIBUTE SAFE CONSTRUCTION BILL OF RIGHTS 2K8 — 27-2009.2 FAILURE TO POST OR DISTRIBUTE "SAFE CONSTRUCTION BILL OF RIGHTS"
39201048N
ACTIVE
October 28, 2026
9:30 AM
CLASS - 1 PENDING $10,000.00 FAILURE TO PROVIDE PROTECTION FOR TENANTS DURING DEMOLITION OR CONSTRUCTION ACTIVITY IN AN OCCUPIED BUILDING. TPP FOR JOB# M01309417-I1-GC IS NOT IN COMPLIANCE. OBSERVED AT APTS 44 AND 22 EXCESSIVE DUST ACCUMUL 1N7

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: Work Without a Permit; Periodic / Local Law Filing; Demolition. The hearing date is October 28, 2026; the source issue date(s) are August 19, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39201053H

CLASS - 1 · Issued August 19, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ELECTRICAL WORK WITHOUT A PERMIT. OBSERVED TEMP ELECTRICAL PANEL INSTALLED AT ROOF FOR SUSPENDED SCAFFOLD WITHOUT PERMITS FILED WITH DOB. PSWO# OP-71-26-11117, OBTAIN PERMIT

Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Periodic / Local Law Filing — Summons 39201045H

CLASS - 2 · Issued August 19, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO POST OR DISTRIBUTE "SAFE CONSTRUCTION BILL OF RIGHTS. PER 27-2009.2 LOCAL LAW 159 OF 2017 FOR JOB#B01309417-I1-GC, POST OR DISTRIBUTE SAFE CONSTRUCTION BILL OF RIGHTS

Cited provision(s): 2K8 — 27-2009.2 FAILURE TO POST OR DISTRIBUTE "SAFE CONSTRUCTION BILL OF RIGHTS"

How this type of condition is typically resolved

Periodic-filing charges are usually resolved by determining the missed cycle or report, completing the required inspection/report through the qualified professional, and addressing the specific missed-filing violation and penalties.

Hearing issues to verify

  • Was the required report actually filed under another device, BIN, cycle or filing number?
  • Was the property/device subject to the cited periodic requirement during that cycle?
  • Was a timely filing rejected for a curable administrative reason?

Evidence that may matter

  • Prior inspection report and filing receipt
  • DOB NOW / agency filing history
  • Qualified professional's inspection records
  • Proof of device status or exemption

Demolition — Summons 39201048N

CLASS - 1 · Issued August 19, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO PROVIDE PROTECTION FOR TENANTS DURING DEMOLITION OR CONSTRUCTION ACTIVITY IN AN OCCUPIED BUILDING. TPP FOR JOB# M01309417-I1-GC IS NOT IN COMPLIANCE. OBSERVED AT APTS 44 AND 22 EXCESSIVE DUST ACCUMUL

Cited provision(s): 1N7

How this type of condition is typically resolved

Demolition charges can involve missing permits, missing notifications, unsafe demolition practices or work outside approved scope. Resolution requires identifying the exact procedural/safety failure and completing the missing filing or corrective work.

Hearing issues to verify

  • Was a demolition permit or required notification in effect before work began?
  • Did the cited activity constitute demolition under the applicable filing, or another permitted scope?
  • Do contractor and agency records show the required notice was timely?

Evidence that may matter

  • Demolition permit and DOB NOW filing history
  • Required notification confirmation / timestamp
  • Asbestos/environmental documents
  • Contractor logs, photographs and demolition sequence records

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.