BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3056653

Brooklyn property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 28, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Sidewalk Shed / Scaffold

BoroughBrooklyn
BIN3056653
Block / Lot01979 / 0013
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039558281L (source ECB number 39558281L). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
35721721H
ACTIVE
October 28, 2026
8:30 AM
CLASS - 1 PENDING $4,800.00 FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED. AT TIME OF INSPECTION, OBSERVED 5 STORY MULTIPLE DWELLING UNDERGOING FULL DEMOLITION UNDER PERMIT #B01284340, SHED WAS NOT PUT UP FOR DEMO WORK AS PER CODE BUILD 131 — BC 3307.3.1,27-102(A) FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED
39558280J
ACTIVE
October 28, 2026
8:30 AM
CLASS - 1 PENDING $10,000.00 AT TIME OF INSPECTION OBSERVED: GC FAILURE TO SAFEGUARD PUBLIC AND PROPERTY, NO MEANS OF OVERHEAD PROTECTION FOR ADJACENT OCCUPIED BUILDING, AT EXPOSURE# 2 BRICKS THROUGHOUT AT ADJOINING OCCUPIED COURTYARD. CRE 1P3
39558281L
ACTIVE
October 28, 2026
9:30 AM
CLASS - 2 PENDING $2,500.00 BC 3309.9 WEATHERPROOF INTEGRITY OF ADJOINING BUILDINGS. AT TIME OF INSPECTION OBSERVED: BUILDING FULLY DEMOLISHED 5TH FL. LEVEL. NO WEATHERPROOF AT EXPO# 2 ADJOINING PROPERTY 475 WASHINGTON AVENUE SIDE, WALL E 2P7

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: Sidewalk Shed / Scaffold; Site Safety / Safeguarding; Demolition. The hearing date is October 28, 2026; the source issue date(s) are August 19, 2026, August 24, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Sidewalk Shed / Scaffold — Summons 35721721H

CLASS - 1 · Issued August 19, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED. AT TIME OF INSPECTION, OBSERVED 5 STORY MULTIPLE DWELLING UNDERGOING FULL DEMOLITION UNDER PERMIT #B01284340, SHED WAS NOT PUT UP FOR DEMO WORK AS PER CODE BUILD

Cited provision(s): 131 — BC 3307.3.1,27-102(A) FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Site Safety / Safeguarding — Summons 39558280J

CLASS - 1 · Issued August 24, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED: GC FAILURE TO SAFEGUARD PUBLIC AND PROPERTY, NO MEANS OF OVERHEAD PROTECTION FOR ADJACENT OCCUPIED BUILDING, AT EXPOSURE# 2 BRICKS THROUGHOUT AT ADJOINING OCCUPIED COURTYARD. CRE

Cited provision(s): 1P3

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Demolition — Summons 39558281L

CLASS - 2 · Issued August 24, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: BC 3309.9 WEATHERPROOF INTEGRITY OF ADJOINING BUILDINGS. AT TIME OF INSPECTION OBSERVED: BUILDING FULLY DEMOLISHED 5TH FL. LEVEL. NO WEATHERPROOF AT EXPO# 2 ADJOINING PROPERTY 475 WASHINGTON AVENUE SIDE, WALL E

Cited provision(s): 2P7

How this type of condition is typically resolved

Demolition charges can involve missing permits, missing notifications, unsafe demolition practices or work outside approved scope. Resolution requires identifying the exact procedural/safety failure and completing the missing filing or corrective work.

Hearing issues to verify

  • Was a demolition permit or required notification in effect before work began?
  • Did the cited activity constitute demolition under the applicable filing, or another permitted scope?
  • Do contractor and agency records show the required notice was timely?

Evidence that may matter

  • Demolition permit and DOB NOW filing history
  • Required notification confirmation / timestamp
  • Asbestos/environmental documents
  • Contractor logs, photographs and demolition sequence records

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.