Sidewalk Shed / Scaffold — Summons 39556888Z
DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OF A 5 STORY BUILDING, I OBSERVED SIDEWALK SHED IN PLACE AT EXPOSURE #1, THAT WAS NOT EXTENDED 5 FEET OVER THE PROPERTY LINE AT BOTH SIDE OF THE SHED. FAILURE TO PROVIDE AND MAINTAI
Cited provision(s): 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records