BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3059514

Brooklyn property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 7, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBrooklyn
BIN3059514
Block / Lot02131 / 0017
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039557416P (source ECB number 39557416P). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557416P
ACTIVE
October 7, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 AT THE TIME OF MY INSPECTION OBSERVED CONSTRUCTION FENCE INSTALLED AT EXP#1-UPPON CHECKING DOB RECORD NO PERMIT ISSUED FOR INSTALLED FENCE-APPLICATION#B0137259-PREVIOUS PERMIT#B01041778-AS WOOD ENCLOSURE ATTACH 2L1 — 28-105.1 FAILURE TO OBTAIN A TEMPORARY CONSTRUCTION PERMIT PRIOR TO INSTALLATIO
39557417R
ACTIVE
October 7, 2026
8:30 AM
CLASS - 2 PENDING $1,000.00 OBSERVED CONSTRUCTION FENCE INSTALLED AT EXP #1 NOT CONSTRUCTED/MAINTAINED AS PER CODE-DOOR/ENTRY WAY OPENS TO SIDEWALK SIDE(PUBLIC WAY),NOT FULLY PAINTED HUNTER GREEN , POSTERS/GRAFFITI ON FENCE 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
39557418Z
ACTIVE
October 7, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 AT THE TIME OF MY INSPECTION OBSERVED CONSTRUCTION FENCE AT EXP#1 -NO JOB INFORMATION PROVIDED AS REQUIRED BY CODE 217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: Work Without a Permit; Sidewalk Shed / Scaffold; Site Safety / Safeguarding. The hearing date is October 7, 2026; the source issue date(s) are August 3, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39557416P

CLASS - 2 · Issued August 3, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OBSERVED CONSTRUCTION FENCE INSTALLED AT EXP#1-UPPON CHECKING DOB RECORD NO PERMIT ISSUED FOR INSTALLED FENCE-APPLICATION#B0137259-PREVIOUS PERMIT#B01041778-AS WOOD ENCLOSURE ATTACH

Cited provision(s): 2L1 — 28-105.1 FAILURE TO OBTAIN A TEMPORARY CONSTRUCTION PERMIT PRIOR TO INSTALLATIO

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Sidewalk Shed / Scaffold — Summons 39557417R

CLASS - 2 · Issued August 3, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED CONSTRUCTION FENCE INSTALLED AT EXP #1 NOT CONSTRUCTED/MAINTAINED AS PER CODE-DOOR/ENTRY WAY OPENS TO SIDEWALK SIDE(PUBLIC WAY),NOT FULLY PAINTED HUNTER GREEN , POSTERS/GRAFFITI ON FENCE

Cited provision(s): 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Site Safety / Safeguarding — Summons 39557418Z

CLASS - 2 · Issued August 3, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OBSERVED CONSTRUCTION FENCE AT EXP#1 -NO JOB INFORMATION PROVIDED AS REQUIRED BY CODE

Cited provision(s): 217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.