October 2026 NYC DOB / OATH Hearing — BIN 3065421

Brooklyn property record with 5 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 9, 2026, October 16, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBrooklyn
BIN3065421
Block / Lot02600 / 0031
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039159499X (source ECB number 39159499X). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
35668268Z
ACTIVE
October 9, 2026
9:00 AM
CLASS - 1 DEFAULT $2,530.00 WORK AFTER HOURS WITHOUT A VARIANCE PERMIT CONTRARY TO 28-105.12.5.AFTER HOUR CONSTRUCTION TOOK PLACE ON SATURDAY SEPTEMBER 6TH WITH NO AFTER HOUR VARIANCE PERMIT FILED IN THE DOB SYSTEM #44991 WAS SUBMITTED ON 1C6 — 28-105.1 WORK AFTER HOURS W/O VARIANCE PERMIT CONTRARY TO 28-105.12.5
35668414H
ACTIVE
October 16, 2026
9:00 AM
CLASS - 1 DEFAULT $5,030.00 FAILURE TO PROMPTLY NOTIFY THE DEPARTMENT OF AN ACCIDENT,INCIDENT OR DAMAGED TO ADJOINING PROPERTY AT CONSTRUCTION/DEMOLITION SITE.GC FAILEDTO NOTIFY THE DEPARTMENT OF AN INCIDENT THAT OCCURRED ON 9/6/25.AS PER 192 — BC 3301.8 FAILURE TO IMMEDIATELY NOTIFY THE DEPARTMENT OF AN ACCIDENT AT CONSTRU
39159499X
ACTIVE
October 16, 2026
9:00 AM
CLASS - 1 DEFAULT $10,030.00 UPON INSPECTION, FULL DEMOLITION UNDERGOING OPERATION AND CONTRACTOR FAILED TO PROVIDE OVERHEAD PROTECTION AT ADJACENT PROPERTY ON EXPOSURE 4 (169 MESEROLE AVENUE) AND TO MAINTAIN CONSTRUCTION FENCE. THIS CREAT 109 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
39544558H
ACTIVE
October 16, 2026
9:00 AM
CLASS - 2 DEFAULT $1,030.00 AT THE TIME OF INSPECTION, INACTIVE JOBSITE. I OBSERVED THAT THE CONSTRUCTION FENCE PANELS AT EXPOSURE ALL EXPOSURE NOT PROPERLY MAINTAINED PURSUANT TO SUBSECTION ACCORDING TO BC 3307.7. FENCE PANELS IN INADEQ 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
39544560R
ACTIVE
October 16, 2026
9:00 AM
CLASS - 2 DEFAULT $1,280.00 INACTIVE JOBSITE, I OBSERVED CONSTRUCTION FENCE INSTALLED AT ALL EXPOSURE IN ADEQUATE CONDITION (PANELS NOT MAINTAINED NOT FULLY ENCLOSED WITH COLLAPSE PANEL). AFTER REVIEW OF BIS & DOB RECORDS FENCE PERMIT EXP 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: Work Without a Permit; Demolition; Site Safety / Safeguarding; Sidewalk Shed / Scaffold; Construction Fence. The hearing dates are October 16, 2026, October 9, 2026; the source issue date(s) are September 6, 2025, September 7, 2025, September 8, 2025.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 35668268Z

CLASS - 1 · Issued September 6, 2025; hearing October 9, 2026. · Hearing status: DEFAULT

DOB allegation in the source extract: WORK AFTER HOURS WITHOUT A VARIANCE PERMIT CONTRARY TO 28-105.12.5.AFTER HOUR CONSTRUCTION TOOK PLACE ON SATURDAY SEPTEMBER 6TH WITH NO AFTER HOUR VARIANCE PERMIT FILED IN THE DOB SYSTEM #44991 WAS SUBMITTED ON

Cited provision(s): 1C6 — 28-105.1 WORK AFTER HOURS W/O VARIANCE PERMIT CONTRARY TO 28-105.12.5

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Demolition — Summons 35668414H

CLASS - 1 · Issued September 6, 2025; hearing October 16, 2026. · Hearing status: DEFAULT

DOB allegation in the source extract: FAILURE TO PROMPTLY NOTIFY THE DEPARTMENT OF AN ACCIDENT,INCIDENT OR DAMAGED TO ADJOINING PROPERTY AT CONSTRUCTION/DEMOLITION SITE.GC FAILEDTO NOTIFY THE DEPARTMENT OF AN INCIDENT THAT OCCURRED ON 9/6/25.AS PER

Cited provision(s): 192 — BC 3301.8 FAILURE TO IMMEDIATELY NOTIFY THE DEPARTMENT OF AN ACCIDENT AT CONSTRU

How this type of condition is typically resolved

Demolition charges can involve missing permits, missing notifications, unsafe demolition practices or work outside approved scope. Resolution requires identifying the exact procedural/safety failure and completing the missing filing or corrective work.

Hearing issues to verify

  • Was a demolition permit or required notification in effect before work began?
  • Did the cited activity constitute demolition under the applicable filing, or another permitted scope?
  • Do contractor and agency records show the required notice was timely?

Evidence that may matter

  • Demolition permit and DOB NOW filing history
  • Required notification confirmation / timestamp
  • Asbestos/environmental documents
  • Contractor logs, photographs and demolition sequence records

Site Safety / Safeguarding — Summons 39159499X

CLASS - 1 · Issued September 8, 2025; hearing October 16, 2026. · Hearing status: DEFAULT

DOB allegation in the source extract: UPON INSPECTION, FULL DEMOLITION UNDERGOING OPERATION AND CONTRACTOR FAILED TO PROVIDE OVERHEAD PROTECTION AT ADJACENT PROPERTY ON EXPOSURE 4 (169 MESEROLE AVENUE) AND TO MAINTAIN CONSTRUCTION FENCE. THIS CREAT

Cited provision(s): 109 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Sidewalk Shed / Scaffold — Summons 39544558H

CLASS - 2 · Issued September 7, 2025; hearing October 16, 2026. · Hearing status: DEFAULT

DOB allegation in the source extract: AT THE TIME OF INSPECTION, INACTIVE JOBSITE. I OBSERVED THAT THE CONSTRUCTION FENCE PANELS AT EXPOSURE ALL EXPOSURE NOT PROPERLY MAINTAINED PURSUANT TO SUBSECTION ACCORDING TO BC 3307.7. FENCE PANELS IN INADEQ

Cited provision(s): 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Construction Fence — Summons 39544560R

CLASS - 2 · Issued September 7, 2025; hearing October 16, 2026. · Hearing status: DEFAULT

DOB allegation in the source extract: INACTIVE JOBSITE, I OBSERVED CONSTRUCTION FENCE INSTALLED AT ALL EXPOSURE IN ADEQUATE CONDITION (PANELS NOT MAINTAINED NOT FULLY ENCLOSED WITH COLLAPSE PANEL). AFTER REVIEW OF BIS & DOB RECORDS FENCE PERMIT EXP

Cited provision(s): 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT

How this type of condition is typically resolved

Construction-fence charges generally require bringing the fence, gates, viewing panels, height and site protection into compliance with the approved construction-safety setup and maintaining it for the required duration.

Hearing issues to verify

  • Did the fence configuration on the inspection date match the approved/logistics plan?
  • Was the cited opening or defect temporary and promptly corrected?
  • Was a permit or construction-fence filing active where required?

Evidence that may matter

  • Approved construction-fence/site logistics documents
  • Dated photographs
  • Contractor logs and correction invoice
  • Permit/filing record

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.