BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3072674

Brooklyn property record with 2 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 29, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBrooklyn
BIN3072674
Block / Lot03194 / 0017
October Records2
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039153365N (source ECB number 39153365N). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39153364L
ACTIVE
October 29, 2026
9:00 AM
CLASS - 1 DEFAULT $12,500.00 OBSERVED AT CELLAR LEVEL, 3 PIECE BATHROOM, GAS FIRED AC UNIT. AT REAR OF BUILDING OBSERVED 3 AC COMPRESSORS WITH RELATED ELECTRICAL WIRING. NO PERMIT FOR THIS WORK FOUND ON DOB RECORDS., OBTAIN PERMIT 101 — 28-105.1 WORK WITHOUT A PERMIT
39153365N
ACTIVE
October 29, 2026
9:00 AM
CLASS - 1 DEFAULT $12,500.00 OBSERVED TREE GROWING IN CLOSE PROXIMITY TO EXP.3 EXTERIOR WALL CAUSING SEPARATION BETWEEN FOUNDATION AND CONCRETE AT EXTERIOR GRADE LEVEL. ABOVE GAS FIRED AC AT CELLAR CEILING NOT PROTECTED. WASHER/DRYER INSTA 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Work Without a Permit; Façade / Exterior Wall. The hearing date is October 29, 2026; the source issue date(s) are July 10, 2025.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39153364L

CLASS - 1 · Issued July 10, 2025; hearing October 29, 2026. · Hearing status: DEFAULT

DOB allegation in the source extract: OBSERVED AT CELLAR LEVEL, 3 PIECE BATHROOM, GAS FIRED AC UNIT. AT REAR OF BUILDING OBSERVED 3 AC COMPRESSORS WITH RELATED ELECTRICAL WIRING. NO PERMIT FOR THIS WORK FOUND ON DOB RECORDS., OBTAIN PERMIT

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Façade / Exterior Wall — Summons 39153365N

CLASS - 1 · Issued July 10, 2025; hearing October 29, 2026. · Hearing status: DEFAULT

DOB allegation in the source extract: OBSERVED TREE GROWING IN CLOSE PROXIMITY TO EXP.3 EXTERIOR WALL CAUSING SEPARATION BETWEEN FOUNDATION AND CONCRETE AT EXTERIOR GRADE LEVEL. ABOVE GAS FIRED AC AT CELLAR CEILING NOT PROTECTED. WASHER/DRYER INSTA

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.

Hearing issues to verify

  • Does the inspector's description match the actual exposure, floor and defect?
  • Was the condition already repaired or protected before the summons date?
  • Was there a current FISP/QEWI filing addressing the same condition?

Evidence that may matter

  • QEWI report, FISP filing or amended report
  • Close-up and elevation photographs identifying the exact defect
  • Repair proposals, invoices and completion records
  • Engineer/architect letter and inspection documentation

Case-specific next step

For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.