BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3074784

Brooklyn property record with 4 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 14, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Sidewalk Shed / Scaffold

BoroughBrooklyn
BIN3074784
Block / Lot03278 / 0027
October Records4
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039557605Y (source ECB number 39557605Y). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557600P
ACTIVE
October 14, 2026
10:30 AM
CLASS - 2 PENDING $1,000.00 UPON INSPECTION I OBSERVED A FENCE INSTALLED AT EXPOS 1 NOT CONSTRUCTED OR MAINTAINED ACCORDING TO CODE. FENCE NOT MAINTAINED IN SOUND CONDITION. EXCESSIVE GRAFFITI ON FENCE (NOT FULLY PAINTED HUNTER GREEN). PR 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
39557601R
ACTIVE
October 14, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 UPON INSPECTION I OBSERVED A FENCE INSTALLED AT EXPOS 1 WITH A INADEQUATE FENCE PROJECT INFO PANEL INSTALLED CONTRARY TO CODE. MISSING REQUIRED OWNER INFORMATION (CONTACT NUMBER) AND REQUIRED GC INFORMATION (CO 217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC
39557603K
ACTIVE
October 14, 2026
9:30 AM
CLASS - 2 PENDING $2,400.00 UPON INSPECTION I OBSERVED PEDESTRIAN PROTECTION (JERSEY BARRIERS IN STREET) NOT MAINTAINED ACCORDING TO CODE 3307.8 MAINTAINING DEPARTMENT OF TRANSPORTATION PEDESTRIAN AND BICYCLIST PROTECTION IN PLACE. BARRIE 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
39557605Y
ACTIVE
October 14, 2026
9:30 AM
CLASS - 2 PENDING $2,400.00 I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1 CONTRARY TO CODE. MESH SIDEWALK SHED PARAPET NOT INSTALLED CONTRARY TO CODE 3307.6.4.6 PARAPET. VERTICAL MEMBERS PLACED WITHIN 18IN FROM THE FACE OF THE CURB CONT 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 3 Sidewalk Shed / Scaffold summonses; Site Safety / Safeguarding. The hearing date is October 14, 2026; the source issue date(s) are August 6, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Sidewalk Shed / Scaffold — Summons 39557600P

CLASS - 2 · Issued August 6, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UPON INSPECTION I OBSERVED A FENCE INSTALLED AT EXPOS 1 NOT CONSTRUCTED OR MAINTAINED ACCORDING TO CODE. FENCE NOT MAINTAINED IN SOUND CONDITION. EXCESSIVE GRAFFITI ON FENCE (NOT FULLY PAINTED HUNTER GREEN). PR

Cited provision(s): 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Site Safety / Safeguarding — Summons 39557601R

CLASS - 2 · Issued August 6, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UPON INSPECTION I OBSERVED A FENCE INSTALLED AT EXPOS 1 WITH A INADEQUATE FENCE PROJECT INFO PANEL INSTALLED CONTRARY TO CODE. MISSING REQUIRED OWNER INFORMATION (CONTACT NUMBER) AND REQUIRED GC INFORMATION (CO

Cited provision(s): 217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Sidewalk Shed / Scaffold — Summons 39557603K

CLASS - 2 · Issued August 6, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UPON INSPECTION I OBSERVED PEDESTRIAN PROTECTION (JERSEY BARRIERS IN STREET) NOT MAINTAINED ACCORDING TO CODE 3307.8 MAINTAINING DEPARTMENT OF TRANSPORTATION PEDESTRIAN AND BICYCLIST PROTECTION IN PLACE. BARRIE

Cited provision(s): 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Sidewalk Shed / Scaffold — Summons 39557605Y

CLASS - 2 · Issued August 6, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1 CONTRARY TO CODE. MESH SIDEWALK SHED PARAPET NOT INSTALLED CONTRARY TO CODE 3307.6.4.6 PARAPET. VERTICAL MEMBERS PLACED WITHIN 18IN FROM THE FACE OF THE CURB CONT

Cited provision(s): 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Case-specific next step

For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.