What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Work Without a Permit; Plumbing / Gas. The hearing dates are October 14, 2026, October 28, 2026; the source issue date(s) are August 18, 2026, July 28, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Work Without a Permit — Summons 39198045N
CLASS - 2 · Issued July 28, 2026; hearing October 14, 2026. · Hearing status: PENDING
DOB allegation in the source extract: OBSERVED REMOVED ALL THE EXISTING PLUMBING PIPING ALONG WITH PLUMBING FIXTURES THROUGHOUT THE BUILDING (CELLAR, FIRST, 2ND FLOOR). NO PLUMBING PERMIT ISSUED AT THE TIME OF INSPECTION., OBTAIN ALL PERMITS
Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Plumbing / Gas — Summons 39200908J
CLASS - 2 · Issued August 18, 2026; hearing October 28, 2026. · Hearing status: PENDING
DOB allegation in the source extract: ATOI KNOCKED ON DOORS, UNKNOWN MALE WORKERS OPEN THE DOOR. DENIED ME ACCESS ON A PERMITTED SITE. PSWO ISSUED IN THE PROPERTY FOR PLUMBING WORK. CALLED THE GENERAL CONTRACTOR, HE SAID HE CANT GIVE ME ACCESS HE I
Cited provision(s): 2A7 — 28-116.1 PERMIT HOLDER FAIL TO PROVIDE ACCESS AND/OR EXPOSE WORK ON ACTIVE SITE
How this type of condition is typically resolved
Plumbing/gas matters typically require determining whether the work was permitted and performed by the required licensed trade, correcting unsafe or unapproved conditions, and completing inspections/sign-off.
Hearing issues to verify
- Was there a valid plumbing/gas filing covering the cited scope?
- Did the condition predate the respondent's work or ownership?
- Was the cited installation already disconnected or corrected?
Evidence that may matter
- Licensed Master Plumber permit / filing records
- Pressure-test / inspection / utility records
- Invoices and plumber statements
- Photographs showing the installation and correction
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review