BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3092735

Brooklyn property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 9, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Failure to Maintain

BoroughBrooklyn
BIN3092735
Block / Lot04146 / 0032
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039192972R (source ECB number 39192972R). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39192955P
ACTIVE
October 9, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 FAILURE TO MAINTAIN. I OBSERVED IN THE KITCHEN OF THE COMMERCIAL SPACE USE OF A PROHIBITED BUSHING ON A TWO-INCH GAS LINE. AS PER FGC 403.10.4 METALLIC FITTINGS. METALLIC FITTINGS SHALL COMPLY WITH THE FOLLOWIN 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39192972R
ACTIVE
October 9, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 WORK WITHOUT A PERMIT. I OBSERVED IN THE KITCHEN OF COMMERCIAL SPACE THE EXTENSION OF PREVIOUSLY INSTALLED GAS TWO-INCH GAS LINES. THE WORK PERFORMED UNDER JOB #32056878 DOES NOT INCLUDE THE GAS FIRED APPLIANCE 201 — 28-105.1 WORK WITHOUT A PERMIT
39192973Z
ACTIVE
October 9, 2026
8:30 AM
CLASS - 2 PENDING $2,500.00 AUTHORIZATION REQUIRED. GAS SERVICE HAS BEEN RESTORED TO COMMERCIAL SPACE AFTER UNPERMITTED WORK HAS BEEN PERFORMED. AS PER FGC 406.6.2.1 A GAS PIPING SYSTEM SHALL NOT BE ENERGIZED PRIOR TO AUTHORIZATION. SUCH 256 — 27-904 & FGC 406.6.2 GAS BEING SUPPLIED TO BUILDING WITHOUT INSPECTION AND CERTIFICATION BY

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: Failure to Maintain; Work Without a Permit; Plumbing / Gas. The hearing date is October 9, 2026; the source issue date(s) are June 17, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Failure to Maintain — Summons 39192955P

CLASS - 2 · Issued June 17, 2026; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN. I OBSERVED IN THE KITCHEN OF THE COMMERCIAL SPACE USE OF A PROHIBITED BUSHING ON A TWO-INCH GAS LINE. AS PER FGC 403.10.4 METALLIC FITTINGS. METALLIC FITTINGS SHALL COMPLY WITH THE FOLLOWIN

Cited provision(s): 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Work Without a Permit — Summons 39192972R

CLASS - 2 · Issued June 17, 2026; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. I OBSERVED IN THE KITCHEN OF COMMERCIAL SPACE THE EXTENSION OF PREVIOUSLY INSTALLED GAS TWO-INCH GAS LINES. THE WORK PERFORMED UNDER JOB #32056878 DOES NOT INCLUDE THE GAS FIRED APPLIANCE

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Plumbing / Gas — Summons 39192973Z

CLASS - 2 · Issued June 17, 2026; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AUTHORIZATION REQUIRED. GAS SERVICE HAS BEEN RESTORED TO COMMERCIAL SPACE AFTER UNPERMITTED WORK HAS BEEN PERFORMED. AS PER FGC 406.6.2.1 A GAS PIPING SYSTEM SHALL NOT BE ENERGIZED PRIOR TO AUTHORIZATION. SUCH

Cited provision(s): 256 — 27-904 & FGC 406.6.2 GAS BEING SUPPLIED TO BUILDING WITHOUT INSPECTION AND CERTIFICATION BY

How this type of condition is typically resolved

Plumbing/gas matters typically require determining whether the work was permitted and performed by the required licensed trade, correcting unsafe or unapproved conditions, and completing inspections/sign-off.

Hearing issues to verify

  • Was there a valid plumbing/gas filing covering the cited scope?
  • Did the condition predate the respondent's work or ownership?
  • Was the cited installation already disconnected or corrected?

Evidence that may matter

  • Licensed Master Plumber permit / filing records
  • Pressure-test / inspection / utility records
  • Invoices and plumber statements
  • Photographs showing the installation and correction

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.