BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3098876

Brooklyn property record with 2 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 14, 2026, October 16, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Sidewalk Shed / Scaffold

BoroughBrooklyn
BIN3098876
Block / Lot04506 / 0028
October Records2
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039557638K (source ECB number 39557638K). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557638K
ACTIVE
October 14, 2026
10:30 AM
CLASS - 2 PENDING $1,000.00 SITE INACTIVE. OBSERVED NO WORK IN PROGRESS. WALKED PERIMETER. NO ACCESS. VIOLATING CONDITION OBSERVED. TEMPORARY CONSTRUCTION FENCE EQUIPMENT MISSING PLWOOD APROXIMATELY 16 FEET @ EXPO#4 & CORNER OF EXPO 1&2, 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
39156173M
ACTIVE
October 16, 2026
8:30 AM
CLASS - 1 DEFAULT $2,530.00 FAILURE TO MAINTAIN BUILDING : AT TIME OF INSPECTION OBSERVED A PARTIALLY COLLAPSED FACADE EXP. 3 OF THE BUILDING THAT IS OPEN AND UNGUARDED WITH ROTTING WOOD BROKEN WINDOWS, COLLAPSE CEILING, CRACKS ON THE CON 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Sidewalk Shed / Scaffold; Façade / Exterior Wall. The hearing dates are October 14, 2026, October 16, 2026; the source issue date(s) are August 5, 2025, August 6, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Sidewalk Shed / Scaffold — Summons 39557638K

CLASS - 2 · Issued August 6, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: SITE INACTIVE. OBSERVED NO WORK IN PROGRESS. WALKED PERIMETER. NO ACCESS. VIOLATING CONDITION OBSERVED. TEMPORARY CONSTRUCTION FENCE EQUIPMENT MISSING PLWOOD APROXIMATELY 16 FEET @ EXPO#4 & CORNER OF EXPO 1&2,

Cited provision(s): 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Façade / Exterior Wall — Summons 39156173M

CLASS - 1 · Issued August 5, 2025; hearing October 16, 2026. · Hearing status: DEFAULT

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING : AT TIME OF INSPECTION OBSERVED A PARTIALLY COLLAPSED FACADE EXP. 3 OF THE BUILDING THAT IS OPEN AND UNGUARDED WITH ROTTING WOOD BROKEN WINDOWS, COLLAPSE CEILING, CRACKS ON THE CON

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.

Hearing issues to verify

  • Does the inspector's description match the actual exposure, floor and defect?
  • Was the condition already repaired or protected before the summons date?
  • Was there a current FISP/QEWI filing addressing the same condition?

Evidence that may matter

  • QEWI report, FISP filing or amended report
  • Close-up and elevation photographs identifying the exact defect
  • Repair proposals, invoices and completion records
  • Engineer/architect letter and inspection documentation

Case-specific next step

For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.