BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3114008

Brooklyn property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 15, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Site Safety / Safeguarding

BoroughBrooklyn
BIN3114008
Block / Lot05006 / 0050
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039542554L (source ECB number 39542554L). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39542552H
ACTIVE
October 15, 2026
9:00 AM
CLASS - 1 DEFAULT $25,000.00 AT TIME OF INSPECTION, ACTIVE JOBSITE OBSERVED WITH MISSING GUARDRAIL SYSTEM ALONG MULTIPLE UNENCLOSED PERIMETERS, INCLUDING ROOF LEVEL 4 STORIES UP. THIS IS A SERIOUS FALL HAZARD IN VIOLATION OF BC 3308.7, WHI 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
39542553J
ACTIVE
October 15, 2026
9:00 AM
CLASS - 2 DEFAULT $10,000.00 AT TIME OF INSPECTION, MULTIPLE TEMPORARY PLATFORMS WERE OBSERVED IN USE. NO DESIGN DRAWINGS WERE PROVIDED UPON REQUEST. THIS IS A VIOLATION OF BC 3301.6.5 AND 3301.2, AS UNDOCUMENTED PLATFORMS POSE SERIOUS STR 2P7
39542554L
ACTIVE
October 15, 2026
9:00 AM
CLASS - 2 DEFAULT $10,000.00 AT TIME OF INSPECTION, OBSERVED PVC PIPE USED TO SHIELD POWERLINES WITH NO SEPARATION FROM SIDEWALK SHED-POSING ELECTROCUTION AND FIRE HAZARDS. PER BC 3314.4.4.12, ONLY THE UTILITY MAY INSTALL PROTECTION WHEN R 2P7

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: 2 Site Safety / Safeguarding summonses; Sidewalk Shed / Scaffold. The hearing date is October 15, 2026; the source issue date(s) are July 18, 2025.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Site Safety / Safeguarding — Summons 39542552H

CLASS - 1 · Issued July 18, 2025; hearing October 15, 2026. · Hearing status: DEFAULT

DOB allegation in the source extract: AT TIME OF INSPECTION, ACTIVE JOBSITE OBSERVED WITH MISSING GUARDRAIL SYSTEM ALONG MULTIPLE UNENCLOSED PERIMETERS, INCLUDING ROOF LEVEL 4 STORIES UP. THIS IS A SERIOUS FALL HAZARD IN VIOLATION OF BC 3308.7, WHI

Cited provision(s): 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Site Safety / Safeguarding — Summons 39542553J

CLASS - 2 · Issued July 18, 2025; hearing October 15, 2026. · Hearing status: DEFAULT

DOB allegation in the source extract: AT TIME OF INSPECTION, MULTIPLE TEMPORARY PLATFORMS WERE OBSERVED IN USE. NO DESIGN DRAWINGS WERE PROVIDED UPON REQUEST. THIS IS A VIOLATION OF BC 3301.6.5 AND 3301.2, AS UNDOCUMENTED PLATFORMS POSE SERIOUS STR

Cited provision(s): 2P7

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Sidewalk Shed / Scaffold — Summons 39542554L

CLASS - 2 · Issued July 18, 2025; hearing October 15, 2026. · Hearing status: DEFAULT

DOB allegation in the source extract: AT TIME OF INSPECTION, OBSERVED PVC PIPE USED TO SHIELD POWERLINES WITH NO SEPARATION FROM SIDEWALK SHED-POSING ELECTROCUTION AND FIRE HAZARDS. PER BC 3314.4.4.12, ONLY THE UTILITY MAY INSTALL PROTECTION WHEN R

Cited provision(s): 2P7

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.