What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: 2 Sidewalk Shed / Scaffold summonses; Work Without a Permit. The hearing date is October 21, 2026; the source issue date(s) are August 14, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Sidewalk Shed / Scaffold — Summons 39557926P
CLASS - 1 · Issued August 14, 2026; hearing October 21, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OF A 6 STORY BUILDING, I OBSERVED DEBRIS CHUTE INSTALLED AT EXPOSURE #1, SUPPORTED PIPE SCAFFOLD AND SUSPENDED SCAFFOLD IN USED, UPON SCANNING 1 WORKER, WORKERS WALLET IT WAS EXPIRE
Cited provision(s): 1K6 — BC 3321.1 FAILURE TO ENSURE EACH WORKER HAS SUCCESSFULLY COMPLETED THE REQUIRED
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records
Sidewalk Shed / Scaffold — Summons 39557927R
CLASS - 1 · Issued August 14, 2026; hearing October 21, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OF A 6 STORY BUILDING, I OBSERVED DEBRIS CHUTE INSTALLED AT EXPOSURE #1, SUPPORTED PIPE SCAFFOLD AND SUSPENDED SCAFFOLD IN USED AND AT EXPOSURE #4 THERE WERE NO OVERHEAD PROTECTION
Cited provision(s): 1P3
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records
Work Without a Permit — Summons 39557925N
CLASS - 1 · Issued August 14, 2026; hearing October 21, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OF A 6 STORY BUILDING, I OBSERVED DEBRIS CHUTE INSTALLED INSIDE OF PIPE SCAFFOLD AT EXPOSURE #1, UPON REVIEW OF THE APPROVED DOCUMENTS IT REVEAL THAT THERE SHOULD BE DEBRIS NETTING
Cited provision(s): 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Case-specific next step
For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.