What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; Illegal Occupancy / Conversion. The hearing date is October 5, 2026; the source issue date(s) are August 19, 2025.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Work Without a Permit — Summons 39157592L
CLASS - 1 · Issued August 19, 2025; hearing October 5, 2026. · Hearing status: DEFAULT
DOB allegation in the source extract: ATOI OBSERVED NEW ELECTRICAL OUTLETS AND LIGHT FIXTURES INSTALLED IN NEWLY CONSTRUCTED ROOM., OBTAIN PERMIT
Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Illegal Occupancy / Conversion — Summons 39157593N
CLASS - 1 · Issued August 19, 2025; hearing October 5, 2026. · Hearing status: DEFAULT
DOB allegation in the source extract: ATOI OBSERVED NEWLY CREATED ROOM CONTRARY TO BUILDINGS RECORDS., DISCONTINUE ILLEGAL OCCUPANCY OR AMEND C OF O
Cited provision(s): 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
How this type of condition is typically resolved
The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.
Hearing issues to verify
- What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
- Did the inspector accurately identify how the space was being used on the cited date?
- Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
- Is there an approved filing or historical record supporting the present use?
Evidence that may matter
- Certificate of Occupancy / Schedule of Occupancy and approved plans
- Historic occupancy records, permits and prior approved layouts
- Dated photographs and floor plans
- Leases, tenant records or sworn statements concerning actual use
- Permits/inspection records if the condition was legalized or restored
Work Without a Permit — Summons 39157594P
CLASS - 1 · Issued August 19, 2025; hearing October 5, 2026. · Hearing status: DEFAULT
DOB allegation in the source extract: ATOI OBSERVED NEWLY INSTALLED PLUMBING RADIATOR PIPE BRANCHING FROM INTERIOR OF HOUSE CONNECTED TO RADIATOR PIPE., OBTAIN PERMIT
Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Work Without a Permit — Summons 39157595R
CLASS - 1 · Issued August 19, 2025; hearing October 5, 2026. · Hearing status: DEFAULT
DOB allegation in the source extract: ATOI OBSERVED NEWLY ERECTED PARTITION WALLS TO CREATE ENCLOSER OF FRONT PORCH., OBTAIN PERMIT
Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Case-specific next step
For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review