BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3125940

Brooklyn property record with 2 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 28, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBrooklyn
BIN3125940
Block / Lot05369 / 0065
October Records2
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039200785Z (source ECB number 39200785Z). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39200785Z
ACTIVE
October 28, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 ATOI, OBSERVED ELECTRICAL WORK ASSOCIATED WITH AN HVAC SYSTEM, INCLUDING ELECTRICAL WIRING/CONNECTIONS AND EQUIPMENT INSTALLATION/MOUNTED OUTSIDE, AC/HVAC DISCONNECT SWITCH, NO ELECTRICAL PERMIT ON FILE AUTHORI 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
39200786K
ACTIVE
October 28, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 ATOI, OBSERVED 2 STEEL-FRAMED BALCONY/DECK STRUCTURES ERECTED WITHIN THE SIDE YARD AT EXPOSURE #3, FRONT AND REAR, BRIDGING BUILDINGS 357 & 361 DAHILL RD AT THE 2ND-FLOOR LEVEL. DIRECT ACCESS FROM THE 2ND-FLOOR 101 — 28-105.1 WORK WITHOUT A PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: 2 Work Without a Permit summonses. The hearing date is October 28, 2026; the source issue date(s) are August 17, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39200785Z

CLASS - 1 · Issued August 17, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI, OBSERVED ELECTRICAL WORK ASSOCIATED WITH AN HVAC SYSTEM, INCLUDING ELECTRICAL WIRING/CONNECTIONS AND EQUIPMENT INSTALLATION/MOUNTED OUTSIDE, AC/HVAC DISCONNECT SWITCH, NO ELECTRICAL PERMIT ON FILE AUTHORI

Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39200786K

CLASS - 1 · Issued August 17, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI, OBSERVED 2 STEEL-FRAMED BALCONY/DECK STRUCTURES ERECTED WITHIN THE SIDE YARD AT EXPOSURE #3, FRONT AND REAR, BRIDGING BUILDINGS 357 & 361 DAHILL RD AT THE 2ND-FLOOR LEVEL. DIRECT ACCESS FROM THE 2ND-FLOOR

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.