This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Certificate of Correction / Commissioner Order; Construction Fence. The hearing dates are October 22, 2026, October 7, 2026; the source issue date(s) are August 13, 2025, July 27, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Certificate of Correction / Commissioner Order — Summons 39197747N
CLASS - 2 · Issued July 27, 2026; hearing October 7, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO CERTIFY CORRECTION OF PREVIOUS CONDITION CITED IN VIOLATION # 35668485P ISSUED ON 09/01/2025. NOTED: FSWO IS STILL ACTIVE AT SITE., FILE A CERTIFICATE OF CORRECTION
Cited provision(s): 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
How this type of condition is typically resolved
This charge focuses on failure to complete or document the DOB correction process for an earlier summons. The practical task is usually to identify the underlying summons, confirm that its physical condition was actually corrected, and complete the current DOB Certificate of Correction requirements with the supporting proof and any applicable civil-penalty documentation.
Hearing issues to verify
- Was a Certificate of Correction already submitted or approved for the underlying summons before this charge was issued?
- Does DOB's record identify the same underlying summons number and correction deadline described in this citation?
- Was the physical condition actually corrected, and can that correction be tied to the cited condition rather than a different job or location?
Evidence that may matter
- DOB NOW / AEU Certificate of Correction submission or approval record
- Before-and-after photographs tied to the cited condition
- Permits, inspection results, contractor receipts or professional statements supporting the correction
- Proof of applicable DOB civil-penalty payment or waiver, if required
Construction Fence — Summons 39157116K
CLASS - 2 · Issued August 13, 2025; hearing October 22, 2026. · Hearing status: DEFAULT
DOB allegation in the source extract: FAILURE TO PROVIDE INSPECTION ACCESS TO AND/OR EXPOSE ONGOING CONSTRUCTION. ATOI REPEATED KNOCKS ON CONSTRUCTION FENCE DOOR AND VERBAL REQUESTS TO ENTER IGNORED. CONSTRUCTION WORKER WEARING A BLUE HARD HAT SEEN
Cited provision(s): 2A7 — 28-116.1 PERMIT HOLDER FAIL TO PROVIDE ACCESS AND/OR EXPOSE WORK ON ACTIVE SITE
How this type of condition is typically resolved
Construction-fence charges generally require bringing the fence, gates, viewing panels, height and site protection into compliance with the approved construction-safety setup and maintaining it for the required duration.
Hearing issues to verify
- Did the fence configuration on the inspection date match the approved/logistics plan?
- Was the cited opening or defect temporary and promptly corrected?
- Was a permit or construction-fence filing active where required?
Evidence that may matter
- Approved construction-fence/site logistics documents
- Dated photographs
- Contractor logs and correction invoice
- Permit/filing record
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review