BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3127695

Brooklyn property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 7, 2026, October 21, 2026, October 28, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Façade / Exterior Wall

BoroughBrooklyn
BIN3127695
Block / Lot05416 / 0069
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039197038K (source ECB number 39197038K). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39197038K
ACTIVE
October 7, 2026
8:30 AM
CLASS - 2 PENDING $2,500.00 ATOI, OBSERVED A 4-STORY MIXED-USE BUILDING WITH MULTIPLE WINDOW A/C UNITS INSTALLED AT APARTMENTS ON THE 3RD-FL. RIGHT AND 2ND-FL. LEFT FRONT WINDOWS AT EXPOSE 1, ABOVE THE FRONT YARD RIGHT & LEFT SIDES OF THE 204 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
39199212X
ACTIVE
October 21, 2026
10:30 AM
CLASS - 3 PENDING $200.00 FENCE EXCEEDS PERMITTED HEIGHT. NOTED AT A 4-STORY MULTI-DWELLING OBSERVED A REAR YARD FENCE AT EXPOSURE 2 APPROX. 9 FEET 6 INCHES IN HEIGHT WHICH EXCEEDS THE PERMITTED HEIGHT., CONFORM FENCE TO HEIGHT REQUIREM 307 — 27-509,BC 3111.1 FENCE EXCEEDS PERMITTED HEIGHT
39201301H
ACTIVE
October 28, 2026
8:30 AM
CLASS - 3 PENDING $500.00 PLANTING INSUFFICIENT. NOTED: AT A 4-STORY MULTI DWELLING OBSERVED ENTIRE FRONT YARD PAVED IN CONCRETE. OBSERVED NO PLANTING WHICH IS REQUIRED IN AN R7A ZONE.; ZR-MISC, COMPLY WITH ZONING RESOLUTION 384 — ZR-MISC MISCELLANEOUS VIOLATIONS OF THE ZONING RESOLUTION

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: Façade / Exterior Wall; Fence / Height / Zoning; Zoning / Parking / Use. The hearing dates are October 21, 2026, October 28, 2026, October 7, 2026; the source issue date(s) are August 20, 2026, August 5, 2026, July 21, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Façade / Exterior Wall — Summons 39197038K

CLASS - 2 · Issued July 21, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI, OBSERVED A 4-STORY MIXED-USE BUILDING WITH MULTIPLE WINDOW A/C UNITS INSTALLED AT APARTMENTS ON THE 3RD-FL. RIGHT AND 2ND-FL. LEFT FRONT WINDOWS AT EXPOSE 1, ABOVE THE FRONT YARD RIGHT & LEFT SIDES OF THE

Cited provision(s): 204 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES

How this type of condition is typically resolved

Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.

Hearing issues to verify

  • Does the inspector's description match the actual exposure, floor and defect?
  • Was the condition already repaired or protected before the summons date?
  • Was there a current FISP/QEWI filing addressing the same condition?

Evidence that may matter

  • QEWI report, FISP filing or amended report
  • Close-up and elevation photographs identifying the exact defect
  • Repair proposals, invoices and completion records
  • Engineer/architect letter and inspection documentation

Fence / Height / Zoning — Summons 39199212X

CLASS - 3 · Issued August 5, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FENCE EXCEEDS PERMITTED HEIGHT. NOTED AT A 4-STORY MULTI-DWELLING OBSERVED A REAR YARD FENCE AT EXPOSURE 2 APPROX. 9 FEET 6 INCHES IN HEIGHT WHICH EXCEEDS THE PERMITTED HEIGHT., CONFORM FENCE TO HEIGHT REQUIREM

Cited provision(s): 307 — 27-509,BC 3111.1 FENCE EXCEEDS PERMITTED HEIGHT

How this type of condition is typically resolved

The correction path depends on fence height, location, zoning and property type. The owner may need to reduce/remove the fence or document that it complies with the applicable permitted height/setback requirements.

Hearing issues to verify

  • Was the height measured from the correct grade and at the cited location?
  • Do zoning or approved plans allow the fence as installed?
  • Was the cited fence temporary construction fencing rather than a permanent zoning fence?

Evidence that may matter

  • Survey and field measurements
  • Zoning map / approved plans
  • Photographs showing height and location
  • Permit or prior approval if applicable

Zoning / Parking / Use — Summons 39201301H

CLASS - 3 · Issued August 20, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: PLANTING INSUFFICIENT. NOTED: AT A 4-STORY MULTI DWELLING OBSERVED ENTIRE FRONT YARD PAVED IN CONCRETE. OBSERVED NO PLANTING WHICH IS REQUIRED IN AN R7A ZONE.; ZR-MISC, COMPLY WITH ZONING RESOLUTION

Cited provision(s): 384 — ZR-MISC MISCELLANEOUS VIOLATIONS OF THE ZONING RESOLUTION

How this type of condition is typically resolved

Zoning charges require comparing the observed use, parking arrangement or physical condition to the applicable zoning district, lawful occupancy and any prior approvals or variances. Correction can mean stopping the use, restoring required parking, or pursuing a lawful approval if available.

Hearing issues to verify

  • Is the cited zoning district/use classification correct for this lot?
  • Was the alleged use actually occurring on the issue date?
  • Is there a prior BSA/CPC/DOB approval, variance or grandfathered condition relevant to the charge?

Evidence that may matter

  • Zoning map and ZOLA/property records
  • Certificate of Occupancy / approved plans
  • Survey or parking layout
  • Prior approvals, variances, permits and dated photographs

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.