Brooklyn property record with 7 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 14, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBrooklyn
BIN3127709
Block / Lot05416 / 0097
October Records7
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039198469R (source ECB number 39198469R). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39198489Y
ACTIVE
October 14, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 ATOI OBSERVED UNAPPROVED AND UNPERMITTED PLUMBING WORK. THE ENTIRE HOUSE CONTAINS NEW WATER, SANITARY & GAS PIPING IN THE CELLAR, 1ST FLOOR, 2ND FLOOR AND OSP. MOST OF THE WORK HAS BEEN COMPLETED. PLUMBING PIPE 101 — 28-105.1 WORK WITHOUT A PERMIT
39198492P
ACTIVE
October 14, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 ATOI OBSERVED A NEW THREE-STORY REAR ADDITION. A SEARCH OF DOB RECORDS FOUND NO STRUCTURAL PERMITS FOR THE NEW FOUNDATION, REMOVAL OF THE EXISTING REAR FACADE, OR ENLARGEMENT OF THE BUILDING STRUCTURE., OBTAIN 101 — 28-105.1 WORK WITHOUT A PERMIT
39198498X
ACTIVE
October 14, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 ATOI OBSERVED WORK WITHOUT A PERMIT. THE ENTIRE HOUSE HAS NEW ELECTRICAL PANELS, WIRING, OUTLETS, LIGHTING, AND EQUIPMENT CONNECTIONS INSTALLED WITHOUT ELECTRICAL PERMITS. WORK HAS BEEN SUBSTANTIALLY COMPLETED 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
39198469R
ACTIVE
October 14, 2026
8:30 AM
CLASS - 1 PENDING $10,000.00 ATOI OBSERVED CONSTRUCTION WORK TAKING PLACE WHILE AN ACTIVE STOP WORK ORDER WAS IN EFFECT. WORK WAS IN PROGRESS IN THE UNPERMITTED VERTICAL & HORIZONTAL ENLARGEMENT ON ALL FLOORS: CELLAR, 1ST FLOOR & 2ND FLOOR 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
39198490L
ACTIVE
October 14, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 ATOI OBSERVED UNAPPROVED AND UNPERMITTED MECHANICAL WORK. NEW ROOFTOP A/C CONDENSING UNITS WITH RELATED PIPING WERE INSTALLED. A FURNACE AND RELATED DUCTWORK WERE OBSERVED THROUGHOUT THE BUILDING. NO PERMITS WE 101 — 28-105.1 WORK WITHOUT A PERMIT
39198493R
ACTIVE
October 14, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 ATOI FAIL TO MAINTAIN ,OBSERVED AN ACCUMULATION OF COMBUSTIBLE AND NON-COMBUSTIBLE DEBRIS AT THE REAR OF THE PROPERTY. EXCESSIVE CONSTRUCTION MATERIALS AND DEBRIS WERE ALSO OBSERVED IN THE CELLAR, 1ST & 2ND FLO 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39198491N
ACTIVE
October 14, 2026
9:30 AM
CLASS - 1 PENDING $5,000.00 ATOI OBSERVED WORKERS EXPOSED TO AN UNSAFE CONDITION. THE INTERIOR STAIRS TO THE CELLAR HAD BEEN REMOVED, CREATING A LARGE UNPROTECTED FLOOR OPENING. GUARDRAILS AND REQUIRED FALL PROTECTION WERE NOT PROVIDED, C 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 7 summons records for this property identifier. The charge mix is: 4 Work Without a Permit summonses; Stop Work Order; Failure to Maintain; Site Safety / Safeguarding. The hearing date is October 14, 2026; the source issue date(s) are July 30, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39198489Y

CLASS - 1 · Issued July 30, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED UNAPPROVED AND UNPERMITTED PLUMBING WORK. THE ENTIRE HOUSE CONTAINS NEW WATER, SANITARY & GAS PIPING IN THE CELLAR, 1ST FLOOR, 2ND FLOOR AND OSP. MOST OF THE WORK HAS BEEN COMPLETED. PLUMBING PIPE

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39198492P

CLASS - 1 · Issued July 30, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED A NEW THREE-STORY REAR ADDITION. A SEARCH OF DOB RECORDS FOUND NO STRUCTURAL PERMITS FOR THE NEW FOUNDATION, REMOVAL OF THE EXISTING REAR FACADE, OR ENLARGEMENT OF THE BUILDING STRUCTURE., OBTAIN

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39198498X

CLASS - 1 · Issued July 30, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED WORK WITHOUT A PERMIT. THE ENTIRE HOUSE HAS NEW ELECTRICAL PANELS, WIRING, OUTLETS, LIGHTING, AND EQUIPMENT CONNECTIONS INSTALLED WITHOUT ELECTRICAL PERMITS. WORK HAS BEEN SUBSTANTIALLY COMPLETED

Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Stop Work Order — Summons 39198469R

CLASS - 1 · Issued July 30, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED CONSTRUCTION WORK TAKING PLACE WHILE AN ACTIVE STOP WORK ORDER WAS IN EFFECT. WORK WAS IN PROGRESS IN THE UNPERMITTED VERTICAL & HORIZONTAL ENLARGEMENT ON ALL FLOORS: CELLAR, 1ST FLOOR & 2ND FLOOR

Cited provision(s): 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

How this type of condition is typically resolved

An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.

Hearing issues to verify

  • What exact work was covered by the Stop Work Order: all work or only part of the project?
  • Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
  • Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?

Evidence that may matter

  • Copy of the Stop Work Order and any rescission/modification notice
  • DOB permit records and inspector correspondence
  • Daily logs, photographs and contractor records showing when work stopped or resumed
  • Evidence identifying any limited corrective/safety work performed

Work Without a Permit — Summons 39198490L

CLASS - 1 · Issued July 30, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED UNAPPROVED AND UNPERMITTED MECHANICAL WORK. NEW ROOFTOP A/C CONDENSING UNITS WITH RELATED PIPING WERE INSTALLED. A FURNACE AND RELATED DUCTWORK WERE OBSERVED THROUGHOUT THE BUILDING. NO PERMITS WE

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Failure to Maintain — Summons 39198493R

CLASS - 1 · Issued July 30, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI FAIL TO MAINTAIN ,OBSERVED AN ACCUMULATION OF COMBUSTIBLE AND NON-COMBUSTIBLE DEBRIS AT THE REAR OF THE PROPERTY. EXCESSIVE CONSTRUCTION MATERIALS AND DEBRIS WERE ALSO OBSERVED IN THE CELLAR, 1ST & 2ND FLO

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Site Safety / Safeguarding — Summons 39198491N

CLASS - 1 · Issued July 30, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED WORKERS EXPOSED TO AN UNSAFE CONDITION. THE INTERIOR STAIRS TO THE CELLAR HAD BEEN REMOVED, CREATING A LARGE UNPROTECTED FLOOR OPENING. GUARDRAILS AND REQUIRED FALL PROTECTION WERE NOT PROVIDED, C

Cited provision(s): 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Case-specific next step

For this property, the first paid review should reconcile the 7 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.