We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBrooklyn
BIN3130595
Block / Lot05487 / 0052
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 035720343P (source ECB number 35720343P). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
35720341L
ACTIVE
October 27, 2026
8:30 AM
CLASS - 2 PENDING $2,500.00 RESIDENCE CONVERTED, MAINTAINED OR OCCUPIED AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED NUMBER OF FAMILIES AUTHORIZED BY C OF OR OFFICIAL DEPARTMENT RECORDS. NOTED CELLAR LEVEL OF THIS 2-FAMILY DWELLINGS H 2K6 — 28-210.1 RESIDENCE CONVERTED MAINTAINED OR OCCUPIED AS A DWELLING FOR MORE THAN
35720342N
ACTIVE
October 27, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. FAILURE TO PROVIDE THE REQUIRED NUMBER OF MEANS OF EGRESS FOR EVERY FLOOR AS PER BC1018.1(2008); BC 1021.1(2019); BC 1026.3(2022); AND 27-366 FOR CLASS " 189 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. FAILURE TO PR
35720343P
ACTIVE
October 27, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 WORK WITHOUT A PERMIT. ILLEGAL CONSTRUCTION WORK NOTED AT CELLAR LEVEL, HAVING ERECTED FULL HEIGHT PARTITIONS TO CREATE CLASS "A" APPARTMENTWITH BEDROOM, KITCHEN AND 3PCS BATHROOM. REMEDY: OBTAIN ALL PERMITS. 101 — 28-105.1 WORK WITHOUT A PERMIT
35720344R
ACTIVE
October 27, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 WORK WITHOUT A PERMIT. ILLEGAL PLUMBING WORK NOTED AT CELLAR LEVEL, HAVING INSTALLED WASTE, WATER AND GAS LINES FOR 3PCS BATHROOM AND KITCHEN. REMEDY: OBTAIN ALL PERMITS. 101 — 28-105.1 WORK WITHOUT A PERMIT
35720345Z
ACTIVE
October 27, 2026
8:30 AM
CLASS - 1 PENDING $1,600.00 ELECTRICAL WORK WITHOUT A PERMIT. ILLEGAL ELECTRICAL WORK NOTED AT CELLAR LEVELM HAVING INSTALLED ELECTRICAL WIRING FOR LIGHT FIXTURES, OUTLETS AND SWITCHES. REMEDY: OBTAIN ALL PERMITS. 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; Illegal Occupancy / Conversion; Egress / Exit Obstruction. The hearing date is October 27, 2026; the source issue date(s) are December 1, 2025.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Illegal Occupancy / Conversion — Summons 35720341L

CLASS - 2 · Issued December 1, 2025; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: RESIDENCE CONVERTED, MAINTAINED OR OCCUPIED AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED NUMBER OF FAMILIES AUTHORIZED BY C OF OR OFFICIAL DEPARTMENT RECORDS. NOTED CELLAR LEVEL OF THIS 2-FAMILY DWELLINGS H

Cited provision(s): 2K6 — 28-210.1 RESIDENCE CONVERTED MAINTAINED OR OCCUPIED AS A DWELLING FOR MORE THAN

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Egress / Exit Obstruction — Summons 35720342N

CLASS - 1 · Issued December 1, 2025; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. FAILURE TO PROVIDE THE REQUIRED NUMBER OF MEANS OF EGRESS FOR EVERY FLOOR AS PER BC1018.1(2008); BC 1021.1(2019); BC 1026.3(2022); AND 27-366 FOR CLASS "

Cited provision(s): 189 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. FAILURE TO PR

How this type of condition is typically resolved

Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.

Hearing issues to verify

  • Was the cited passageway actually required egress for the affected occupancy?
  • Did the alleged obstruction exist when the inspector observed it?
  • Was the condition immediately removed and can the timing be documented?

Evidence that may matter

  • Dated photographs showing the exit path
  • Approved floor/egress plans
  • Building or security logs
  • Statements or work records documenting removal of stored items/obstructions

Work Without a Permit — Summons 35720343P

CLASS - 1 · Issued December 1, 2025; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. ILLEGAL CONSTRUCTION WORK NOTED AT CELLAR LEVEL, HAVING ERECTED FULL HEIGHT PARTITIONS TO CREATE CLASS "A" APPARTMENTWITH BEDROOM, KITCHEN AND 3PCS BATHROOM. REMEDY: OBTAIN ALL PERMITS.

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 35720344R

CLASS - 1 · Issued December 1, 2025; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. ILLEGAL PLUMBING WORK NOTED AT CELLAR LEVEL, HAVING INSTALLED WASTE, WATER AND GAS LINES FOR 3PCS BATHROOM AND KITCHEN. REMEDY: OBTAIN ALL PERMITS.

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 35720345Z

CLASS - 1 · Issued December 1, 2025; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ELECTRICAL WORK WITHOUT A PERMIT. ILLEGAL ELECTRICAL WORK NOTED AT CELLAR LEVELM HAVING INSTALLED ELECTRICAL WIRING FOR LIGHT FIXTURES, OUTLETS AND SWITCHES. REMEDY: OBTAIN ALL PERMITS.

Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.