BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3132017

Brooklyn property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 26, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Stop Work Order

BoroughBrooklyn
BIN3132017
Block / Lot05515 / 0053
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039146516X (source ECB number 39146516X). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39146516X
ACTIVE
October 26, 2026
8:30 AM
CLASS - 1 PENDING $10,000.00 UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. ISSUED 04/23/2025 VIO-39145712Z. OBSERVED THE INSTALLATION OF A DOUBLE GLASS DOOR INSTALLED ON ILLEGALLY ERECTED BALCONY 2ND FLOOR OF EXPOSURE 2, 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
39146724K
ACTIVE
October 26, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 NO SAFETY GUARDRAIL AT EXPOSURE #3, REAR OF BUILDING 2-FLOOR LEVEL, WHILE 2-MALE OCCUPANTS WORKING, AND WINDOW CONVERTED INTO NEW SMOOTH BLACK SLIDING DOOR AT EXPOSURE #2, AT NEW STEAL BALCONY. AT EXPOSURE #3, 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39146725M
ACTIVE
October 26, 2026
8:30 AM
CLASS - 1 PENDING $10,000.00 OBSERVED 2-MALE OCCUPANT WORKING ON ILLEGAL 1ST FLOOR REAR ROOF, WITH NO SAFETY GUARDRAIL, WITH A FULL STOP WORK ORDER THAT EXIST. SEE COMPLAINT #3A10833 AND VIOLATION #39145709H, COMPLY WITH STOP WORK ORDER 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: 2 Stop Work Order summonses; Failure to Maintain. The hearing date is October 26, 2026; the source issue date(s) are April 29, 2025, May 1, 2025.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Stop Work Order — Summons 39146516X

CLASS - 1 · Issued April 29, 2025; hearing October 26, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. ISSUED 04/23/2025 VIO-39145712Z. OBSERVED THE INSTALLATION OF A DOUBLE GLASS DOOR INSTALLED ON ILLEGALLY ERECTED BALCONY 2ND FLOOR OF EXPOSURE 2,

Cited provision(s): 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

How this type of condition is typically resolved

An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.

Hearing issues to verify

  • What exact work was covered by the Stop Work Order: all work or only part of the project?
  • Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
  • Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?

Evidence that may matter

  • Copy of the Stop Work Order and any rescission/modification notice
  • DOB permit records and inspector correspondence
  • Daily logs, photographs and contractor records showing when work stopped or resumed
  • Evidence identifying any limited corrective/safety work performed

Failure to Maintain — Summons 39146724K

CLASS - 1 · Issued May 1, 2025; hearing October 26, 2026. · Hearing status: PENDING

DOB allegation in the source extract: NO SAFETY GUARDRAIL AT EXPOSURE #3, REAR OF BUILDING 2-FLOOR LEVEL, WHILE 2-MALE OCCUPANTS WORKING, AND WINDOW CONVERTED INTO NEW SMOOTH BLACK SLIDING DOOR AT EXPOSURE #2, AT NEW STEAL BALCONY. AT EXPOSURE #3,

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Stop Work Order — Summons 39146725M

CLASS - 1 · Issued May 1, 2025; hearing October 26, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED 2-MALE OCCUPANT WORKING ON ILLEGAL 1ST FLOOR REAR ROOF, WITH NO SAFETY GUARDRAIL, WITH A FULL STOP WORK ORDER THAT EXIST. SEE COMPLAINT #3A10833 AND VIOLATION #39145709H, COMPLY WITH STOP WORK ORDER

Cited provision(s): 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

How this type of condition is typically resolved

An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.

Hearing issues to verify

  • What exact work was covered by the Stop Work Order: all work or only part of the project?
  • Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
  • Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?

Evidence that may matter

  • Copy of the Stop Work Order and any rescission/modification notice
  • DOB permit records and inspector correspondence
  • Daily logs, photographs and contractor records showing when work stopped or resumed
  • Evidence identifying any limited corrective/safety work performed

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.