BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3132355

Brooklyn property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 7, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Other Building / Code Compliance

BoroughBrooklyn
BIN3132355
Block / Lot05522 / 0068
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039557109P (source ECB number 39557109P). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557109P
ACTIVE
October 7, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 OBSERVATION: UPON MY RESEARCH THERES NO NOTIFICATION FOR EARTHWORK. VIO FOR NO EARTHWORK NOTIFICATIONS. PROVIDE EARTHWORK NOTIFICATION 111 — BC 3304.3,1 RCNY 52-01(A) FAIL TO NOTIFYDOB PRIOR TO COMMENCEMENT OF EARTHWORK
39557107L
ACTIVE
October 7, 2026
8:30 AM
CLASS - 2 PENDING $5,000.00 OBSERVATION: DOCUMENTS PROVIDED. UPON MY REQUEST FOR SOE PLANS, NONE WAS PROVIDED. @ EXPOSURE#2&3 REAR YARD LOCATION SOE AT A DEPTH APPROXIMATELY 8FT W/O BRACING, SHORING OR SHEETING AND NO GUARDRAILS TO ENCLOS 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
39557108N
ACTIVE
October 7, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 OBSERVATION: @ EXPOSURE#1,2,3 NO TEMPORARY CONSTRUCTION (FENCE) EQUIPMENT. VIO FOR NO CONSTRUCTION FENCE CONTRARY TO PLAN.CONFORM TO PLAN/CONSTRUCT/MAINTAIN FENCE 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: Other Building / Code Compliance; Site Safety / Safeguarding; Work Without a Permit. The hearing date is October 7, 2026; the source issue date(s) are July 27, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Other Building / Code Compliance — Summons 39557109P

CLASS - 1 · Issued July 27, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVATION: UPON MY RESEARCH THERES NO NOTIFICATION FOR EARTHWORK. VIO FOR NO EARTHWORK NOTIFICATIONS. PROVIDE EARTHWORK NOTIFICATION

Cited provision(s): 111 — BC 3304.3,1 RCNY 52-01(A) FAIL TO NOTIFYDOB PRIOR TO COMMENCEMENT OF EARTHWORK

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Site Safety / Safeguarding — Summons 39557107L

CLASS - 2 · Issued July 27, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVATION: DOCUMENTS PROVIDED. UPON MY REQUEST FOR SOE PLANS, NONE WAS PROVIDED. @ EXPOSURE#2&3 REAR YARD LOCATION SOE AT A DEPTH APPROXIMATELY 8FT W/O BRACING, SHORING OR SHEETING AND NO GUARDRAILS TO ENCLOS

Cited provision(s): 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Work Without a Permit — Summons 39557108N

CLASS - 2 · Issued July 27, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVATION: @ EXPOSURE#1,2,3 NO TEMPORARY CONSTRUCTION (FENCE) EQUIPMENT. VIO FOR NO CONSTRUCTION FENCE CONTRARY TO PLAN.CONFORM TO PLAN/CONSTRUCT/MAINTAIN FENCE

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.