BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3133065

Brooklyn property record with 5 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 5, 2026, October 9, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBrooklyn
BIN3133065
Block / Lot05538 / 0061
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039149911J (source ECB number 39149911J). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39149909K
ACTIVE
October 5, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 ATOI OBSERVED FULL INTERIOR RENOVATION. AT 2 STAIRCASES OBSERVED NO TEMP HANDRAILS OR GAURDRAILS AT OPENING. POTENTIAL FOR FALL AND SERIOUS INJURY OR DEATH., PROVIDE GUARD RAILS 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
39149911J
ACTIVE
October 5, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 ATOI OBSERVED APPROX 6 YARDS OF DEBRIS IN THE CELLAR. CONSISTING OF COMBUSTIBLE WOOD, 20 BLACK BAGS. PIPES, WIRES ETC. ALSO AT REAR DOOR STOVE, PIPES AND OTHER METAL ITEMS, REPAIR AND/OR REPLACE 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39149912L
ACTIVE
October 5, 2026
8:30 AM
CLASS - 1 PENDING $1,600.00 ATOI OBSERVED A FULL INTERIOR RENOVATION. OBSERVED NEW ELECTRIC THROUGHOUT HOUSE. 40 PLUS LED PUCK LIGHTS, MULTIPLE NEW SWITCHES, OUTLETS. NEW WIRING AT TWO ELECTRIC PANELS. NEW BX CABLES RUN THROUGHOUT., OBTAI 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
39149908Z
ACTIVE
October 9, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 ATOI OBSERVED FULL INTERIOR RENOVATION CONSISTING OF NEW WALLS, PLY SUBFLOOR, DRYWALL THROUGHOUT. ALSO OBSERVED 1 KITCHEN MAKING THIS A 1 FAMILY HOUSE., OBTAIN PERMIT 101 — 28-105.1 WORK WITHOUT A PERMIT
39149910H
ACTIVE
October 9, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 ATOI OBSERVED FULL INTERIOR RENOVATION WITH NEW PLUMBING THROUGHOUT, TUBS, SHOWER BODIES, TOILET ROUGHS, COPPER PIPING AND CAST IRON PIPING IN CELLAR. ALSO NEW GAS LINES RUN FROM THE METERS. NEW PEX TUBING FOR 101 — 28-105.1 WORK WITHOUT A PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; Site Safety / Safeguarding; Failure to Maintain. The hearing dates are October 5, 2026, October 9, 2026; the source issue date(s) are June 4, 2025.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Site Safety / Safeguarding — Summons 39149909K

CLASS - 1 · Issued June 4, 2025; hearing October 5, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED FULL INTERIOR RENOVATION. AT 2 STAIRCASES OBSERVED NO TEMP HANDRAILS OR GAURDRAILS AT OPENING. POTENTIAL FOR FALL AND SERIOUS INJURY OR DEATH., PROVIDE GUARD RAILS

Cited provision(s): 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Failure to Maintain — Summons 39149911J

CLASS - 2 · Issued June 4, 2025; hearing October 5, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED APPROX 6 YARDS OF DEBRIS IN THE CELLAR. CONSISTING OF COMBUSTIBLE WOOD, 20 BLACK BAGS. PIPES, WIRES ETC. ALSO AT REAR DOOR STOVE, PIPES AND OTHER METAL ITEMS, REPAIR AND/OR REPLACE

Cited provision(s): 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Work Without a Permit — Summons 39149912L

CLASS - 1 · Issued June 4, 2025; hearing October 5, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED A FULL INTERIOR RENOVATION. OBSERVED NEW ELECTRIC THROUGHOUT HOUSE. 40 PLUS LED PUCK LIGHTS, MULTIPLE NEW SWITCHES, OUTLETS. NEW WIRING AT TWO ELECTRIC PANELS. NEW BX CABLES RUN THROUGHOUT., OBTAI

Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39149908Z

CLASS - 1 · Issued June 4, 2025; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED FULL INTERIOR RENOVATION CONSISTING OF NEW WALLS, PLY SUBFLOOR, DRYWALL THROUGHOUT. ALSO OBSERVED 1 KITCHEN MAKING THIS A 1 FAMILY HOUSE., OBTAIN PERMIT

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39149910H

CLASS - 1 · Issued June 4, 2025; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED FULL INTERIOR RENOVATION WITH NEW PLUMBING THROUGHOUT, TUBS, SHOWER BODIES, TOILET ROUGHS, COPPER PIPING AND CAST IRON PIPING IN CELLAR. ALSO NEW GAS LINES RUN FROM THE METERS. NEW PEX TUBING FOR

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.