Brooklyn property record with 8 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 13, 2026, October 16, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Other Building / Code Compliance

BoroughBrooklyn
BIN3137185
Block / Lot05627 / 0053
October Records8
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039549020Z (source ECB number 39549020Z). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39549013K
ACTIVE
October 13, 2026
8:30 AM
CLASS - 2 PENDING $5,000.00 AT TIME OF INSPECTION REQUESTED CONSTRUCTION SUPER LOGS WERE NOT MAINTAIN ON SITE AS REQUIRED. ALSO CS FAILED TO APPOINT A COMPETENT PERSON WHILE THE SUPER IS ABSENT FROM SITE. CS WAS UNABLE TO DEMONSTRATE ACTI 2G5 — BC 3301.13.7 THROUGH BC 3301.13.13 CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER CODE.
39549015Y
ACTIVE
October 13, 2026
8:30 AM
CLASS - 2 PENDING $1,000.00 OBSERVED THAT NO CONSTRUCTION FENCE WAS INSTALLED ALONG EXP 1 OF THE SITE, AS REQUIRED TO SAFEGUARD THE PUBLIC AND SECURE THE SITE. THE ABSENCE OF CONSTRUCTION FENCE LEFT THE SITE OPEN AND ACCESSIBLE FROM THE P 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
39549020Z
ACTIVE
October 13, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 IT WAS OBSERVED THAT THE CONSTRUCTION SITE FAILED TO HAVE A REQUIRED SITE SAFETY PLAN AND NO DAILY LOGS ON SITE AVAILABLE FOR REVIEW. UPON REQUEST NO DOCUMENTS WERE AVAILABLE CONTRARY TO BUILDING CODE. STOP ALL 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
39549022M
ACTIVE
October 13, 2026
8:30 AM
CLASS - 1 PENDING $4,800.00 AT THE TIME OF INSPECTION, IT WAS OBSERVED THAT THE CONSTRUCTION SITE FAILED TO PROVIDE A REQUIRED SIDEWALK SHED ALONG EXP 1. ABSENCE OF THE SIDEWALK SHED EXPOSES PEDESTRIANS TO IMMINENT DANGER FROM POTENTIAL F 131 — BC 3307.3.1,27-102(A) FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED
39549025H
ACTIVE
October 13, 2026
8:30 AM
CLASS - 2 PENDING $5,000.00 AT TIME OF INSPECTION NO OVERHEAD PROTECTION WAS PROVIDED FOR THE ADJOINING PROPERTY @ THE CORNER OF EXP 2 & 3. OBSERVED THE BACKYARD TO ADJOINING PROPERTY ( 1164 47 STREET) EXPOSED FROM POSSIBLE FALLING DEBRIS 2P3
39549038R
ACTIVE
October 13, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 AT TIME OF INSPECTION, IT WAS OBSERVED THAT THE CONSTRUCTION SITE FAILED TO HAVE REQUIRED DESIGN DRAWINGS FOR THE INSTALLED TEMPORARY STAIRSON THE INTERIOR OF EXP 4 FROM THE 1ST FLOOR TO ROOF. PROVIDE REQUIRED 206 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
39549039Z
ACTIVE
October 13, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 OBSERVED THAT THE CONSTRUCTION SHANTY ON THE BASEMENT OF THE SITE WAS NOT CONSTRUCTED OF FIRE RATED MATERIALS AS REQUIRED. THIS SHANTY LACKED THE REQUIRED FIRE RESISTANCE RATING, CREATING POTENTIAL FIRE HAZARD 206 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
39541713P
ACTIVE
October 16, 2026
10:30 AM
CLASS - 2 PENDING $5,000.00 AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING UNDER ALTERATION , I OBSERVED THERE WERE NO OVERHEAD PROTECTION PROVIDED AT EXPOSURE 2 ADJACENT PROPERTY SHARED WALK WAY TO PROTECT THE OCCUPANTS ENTERING OR E 2P3

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 8 summons records for this property identifier. The charge mix is: 4 Other Building / Code Compliance summonses; 2 Sidewalk Shed / Scaffold summonses; Site Safety / Safeguarding; Sign / Awning / Advertising. The hearing dates are October 13, 2026, October 16, 2026; the source issue date(s) are January 9, 2026, June 26, 2025.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Other Building / Code Compliance — Summons 39549013K

CLASS - 2 · Issued January 9, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION REQUESTED CONSTRUCTION SUPER LOGS WERE NOT MAINTAIN ON SITE AS REQUIRED. ALSO CS FAILED TO APPOINT A COMPETENT PERSON WHILE THE SUPER IS ABSENT FROM SITE. CS WAS UNABLE TO DEMONSTRATE ACTI

Cited provision(s): 2G5 — BC 3301.13.7 THROUGH BC 3301.13.13 CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER CODE.

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Sidewalk Shed / Scaffold — Summons 39549015Y

CLASS - 2 · Issued January 9, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED THAT NO CONSTRUCTION FENCE WAS INSTALLED ALONG EXP 1 OF THE SITE, AS REQUIRED TO SAFEGUARD THE PUBLIC AND SECURE THE SITE. THE ABSENCE OF CONSTRUCTION FENCE LEFT THE SITE OPEN AND ACCESSIBLE FROM THE P

Cited provision(s): 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Site Safety / Safeguarding — Summons 39549020Z

CLASS - 1 · Issued January 9, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: IT WAS OBSERVED THAT THE CONSTRUCTION SITE FAILED TO HAVE A REQUIRED SITE SAFETY PLAN AND NO DAILY LOGS ON SITE AVAILABLE FOR REVIEW. UPON REQUEST NO DOCUMENTS WERE AVAILABLE CONTRARY TO BUILDING CODE. STOP ALL

Cited provision(s): 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Sidewalk Shed / Scaffold — Summons 39549022M

CLASS - 1 · Issued January 9, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF INSPECTION, IT WAS OBSERVED THAT THE CONSTRUCTION SITE FAILED TO PROVIDE A REQUIRED SIDEWALK SHED ALONG EXP 1. ABSENCE OF THE SIDEWALK SHED EXPOSES PEDESTRIANS TO IMMINENT DANGER FROM POTENTIAL F

Cited provision(s): 131 — BC 3307.3.1,27-102(A) FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Other Building / Code Compliance — Summons 39549025H

CLASS - 2 · Issued January 9, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION NO OVERHEAD PROTECTION WAS PROVIDED FOR THE ADJOINING PROPERTY @ THE CORNER OF EXP 2 & 3. OBSERVED THE BACKYARD TO ADJOINING PROPERTY ( 1164 47 STREET) EXPOSED FROM POSSIBLE FALLING DEBRIS

Cited provision(s): 2P3

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Sign / Awning / Advertising — Summons 39549038R

CLASS - 2 · Issued January 9, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION, IT WAS OBSERVED THAT THE CONSTRUCTION SITE FAILED TO HAVE REQUIRED DESIGN DRAWINGS FOR THE INSTALLED TEMPORARY STAIRSON THE INTERIOR OF EXP 4 FROM THE 1ST FLOOR TO ROOF. PROVIDE REQUIRED

Cited provision(s): 206 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS

How this type of condition is typically resolved

Sign-related charges usually require confirming zoning/permit requirements, dimensions, illumination and placement, followed by permit/legalization or removal/modification.

Hearing issues to verify

  • Was the sign/awning exempt from a permit or already covered by an approved filing?
  • Were the dimensions/location described by the inspector accurate?
  • Was the sign removed or modified before the summons date or hearing?

Evidence that may matter

  • Sign permit / zoning documents
  • Measured photographs and drawings
  • Removal or modification invoice
  • Prior approvals and storefront plans

Other Building / Code Compliance — Summons 39549039Z

CLASS - 2 · Issued January 9, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED THAT THE CONSTRUCTION SHANTY ON THE BASEMENT OF THE SITE WAS NOT CONSTRUCTED OF FIRE RATED MATERIALS AS REQUIRED. THIS SHANTY LACKED THE REQUIRED FIRE RESISTANCE RATING, CREATING POTENTIAL FIRE HAZARD

Cited provision(s): 206 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Other Building / Code Compliance — Summons 39541713P

CLASS - 2 · Issued June 26, 2025; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING UNDER ALTERATION , I OBSERVED THERE WERE NO OVERHEAD PROTECTION PROVIDED AT EXPOSURE 2 ADJACENT PROPERTY SHARED WALK WAY TO PROTECT THE OCCUPANTS ENTERING OR E

Cited provision(s): 2P3

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Case-specific next step

For this property, the first paid review should reconcile the 8 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.