October 2026 NYC DOB / OATH Hearing — BIN 3138329

Brooklyn property record with 2 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 14, 2026, October 28, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Stop Work Order

BoroughBrooklyn
BIN3138329
Block / Lot05654 / 0050
October Records2
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039198316X (source ECB number 39198316X). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39198316X
ACTIVE
October 14, 2026
8:30 AM
CLASS - 1 PENDING $12,500.00 ATOI, OBSERVED PSWO STICKER ISSUED ON 01/22/2026 UNDER COMPLAINT # 3A45682, WAS REMOVED FROM RESIDENTIAL ENTRY DOOR. SWO STICKER MUST NOT BE REMOVED UNTIL IT HAS BEEN RESCINDED. VIOLATION ASS0CIATED WITH SWO AR 1F8 — 28-207.2.5 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER
39201497Z
ACTIVE
October 28, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 OBSERVED NEWLY INSTALLED GAS PIPING AND VALVES FOR A GAS DRYER AND COOKING STOVE IN THE 2ND-FLOOR APARTMENT, AND NEWLY INSTALLED GAS PIPING AND VALVES FOR A COOKING STOVE AND GAS DRYER IN THE 3RD-FLOOR APARTMEN 201 — 28-105.1 WORK WITHOUT A PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Stop Work Order; Work Without a Permit. The hearing dates are October 14, 2026, October 28, 2026; the source issue date(s) are August 24, 2026, July 29, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Stop Work Order — Summons 39198316X

CLASS - 1 · Issued July 29, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI, OBSERVED PSWO STICKER ISSUED ON 01/22/2026 UNDER COMPLAINT # 3A45682, WAS REMOVED FROM RESIDENTIAL ENTRY DOOR. SWO STICKER MUST NOT BE REMOVED UNTIL IT HAS BEEN RESCINDED. VIOLATION ASS0CIATED WITH SWO AR

Cited provision(s): 1F8 — 28-207.2.5 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER

How this type of condition is typically resolved

An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.

Hearing issues to verify

  • What exact work was covered by the Stop Work Order: all work or only part of the project?
  • Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
  • Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?

Evidence that may matter

  • Copy of the Stop Work Order and any rescission/modification notice
  • DOB permit records and inspector correspondence
  • Daily logs, photographs and contractor records showing when work stopped or resumed
  • Evidence identifying any limited corrective/safety work performed

Work Without a Permit — Summons 39201497Z

CLASS - 2 · Issued August 24, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED NEWLY INSTALLED GAS PIPING AND VALVES FOR A GAS DRYER AND COOKING STOVE IN THE 2ND-FLOOR APARTMENT, AND NEWLY INSTALLED GAS PIPING AND VALVES FOR A COOKING STOVE AND GAS DRYER IN THE 3RD-FLOOR APARTMEN

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.