BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3139474

Brooklyn property record with 5 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 14, 2026, October 21, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Façade / Exterior Wall

BoroughBrooklyn
BIN3139474
Block / Lot05678 / 0053
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039557679R (source ECB number 39557679R). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557680Y
ACTIVE
October 14, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 AT TIME OF INCIDENT FOLLOW UP INSPECTION, SHORING AND SUPPORT WORK WAS IN PROGRESS FOR THE ADJACENT PROPERTY EXTERIOR WALL AT EXP 4 OF THE JOB SITE AND EXPOSURE 2 OF THE ADJACENT PROPERTY. SHORING BEAMS OBSERVE 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
35721664K
ACTIVE
October 14, 2026
8:30 AM
CLASS - 1 PENDING $10,000.00 FAILURE TO PROVIDE PROTECTION IF ADJOINING PROPERTY DURING CONSTRUCTION OR DEMOLOTION AS REQUIRED. AT TIME OF INSPECTION OBSERVED DAMAGE AT ADJACENT BUILDING(145555 STREET) DUE TO CONSTRUCTION ACTIVITY. AS PER 1P3
39557682H
ACTIVE
October 14, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 AT TIME OF FOLLOW UP INSPECTION REGARDING AN INCIDENT RESULTING IN DAMAGE AND CRACKING TO THE ADJACENT PROPERTY EXTERIOR WALL, TEMPORARY SHORING AND SUPPORTING EQUIPMENT WAS OBSERVED INSTALLED TO STABILIZE THE 1G4 — BC 3301.13.10 CONSTRUCTION SUPERINTENDENT FAILED TO IMMEDIATELY NOTIFY THE DEPARTMEN
39557679R
ACTIVE
October 14, 2026
9:30 AM
CLASS - 1 PENDING $5,000.00 AT TIME OF FOLLOW UP INSPECTION REGARDING AN INCIDENT RESULTING IN DAMAGE AND CRACKING TO THE ADJACENT PROPERTY EXTERIOR WALL, TEMPORARY SHORING AND SUPPORTING EQUIPMENT WAS OBSERVED INSTALLED TO STABILIZE THE 192 — BC 3301.8 FAILURE TO IMMEDIATELY NOTIFY THE DEPARTMENT OF AN ACCIDENT AT CONSTRU
39557864Z
ACTIVE
October 21, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 AT THE TIME OF INSPECTION, OBSERVED THAT THE SHORING SYSTEM HAD BEEN FURTHER UPDATED WITH ADDITIONAL STEEL MEMBERS AND CONNECTIONS, CONTRARY TO THE STOP WORK ORDER ISSUED ON 08/06/2026 UNDER COMPLAINT NO. 3A748 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 2 Façade / Exterior Wall summonses; Work Without a Permit; Other Building / Code Compliance; Stop Work Order. The hearing dates are October 14, 2026, October 21, 2026; the source issue date(s) are August 12, 2026, August 6, 2026, August 7, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39557680Y

CLASS - 1 · Issued August 7, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INCIDENT FOLLOW UP INSPECTION, SHORING AND SUPPORT WORK WAS IN PROGRESS FOR THE ADJACENT PROPERTY EXTERIOR WALL AT EXP 4 OF THE JOB SITE AND EXPOSURE 2 OF THE ADJACENT PROPERTY. SHORING BEAMS OBSERVE

Cited provision(s): 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Other Building / Code Compliance — Summons 35721664K

CLASS - 1 · Issued August 6, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO PROVIDE PROTECTION IF ADJOINING PROPERTY DURING CONSTRUCTION OR DEMOLOTION AS REQUIRED. AT TIME OF INSPECTION OBSERVED DAMAGE AT ADJACENT BUILDING(145555 STREET) DUE TO CONSTRUCTION ACTIVITY. AS PER

Cited provision(s): 1P3

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Façade / Exterior Wall — Summons 39557682H

CLASS - 1 · Issued August 7, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF FOLLOW UP INSPECTION REGARDING AN INCIDENT RESULTING IN DAMAGE AND CRACKING TO THE ADJACENT PROPERTY EXTERIOR WALL, TEMPORARY SHORING AND SUPPORTING EQUIPMENT WAS OBSERVED INSTALLED TO STABILIZE THE

Cited provision(s): 1G4 — BC 3301.13.10 CONSTRUCTION SUPERINTENDENT FAILED TO IMMEDIATELY NOTIFY THE DEPARTMEN

How this type of condition is typically resolved

Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.

Hearing issues to verify

  • Does the inspector's description match the actual exposure, floor and defect?
  • Was the condition already repaired or protected before the summons date?
  • Was there a current FISP/QEWI filing addressing the same condition?

Evidence that may matter

  • QEWI report, FISP filing or amended report
  • Close-up and elevation photographs identifying the exact defect
  • Repair proposals, invoices and completion records
  • Engineer/architect letter and inspection documentation

Façade / Exterior Wall — Summons 39557679R

CLASS - 1 · Issued August 7, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF FOLLOW UP INSPECTION REGARDING AN INCIDENT RESULTING IN DAMAGE AND CRACKING TO THE ADJACENT PROPERTY EXTERIOR WALL, TEMPORARY SHORING AND SUPPORTING EQUIPMENT WAS OBSERVED INSTALLED TO STABILIZE THE

Cited provision(s): 192 — BC 3301.8 FAILURE TO IMMEDIATELY NOTIFY THE DEPARTMENT OF AN ACCIDENT AT CONSTRU

How this type of condition is typically resolved

Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.

Hearing issues to verify

  • Does the inspector's description match the actual exposure, floor and defect?
  • Was the condition already repaired or protected before the summons date?
  • Was there a current FISP/QEWI filing addressing the same condition?

Evidence that may matter

  • QEWI report, FISP filing or amended report
  • Close-up and elevation photographs identifying the exact defect
  • Repair proposals, invoices and completion records
  • Engineer/architect letter and inspection documentation

Stop Work Order — Summons 39557864Z

CLASS - 1 · Issued August 12, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF INSPECTION, OBSERVED THAT THE SHORING SYSTEM HAD BEEN FURTHER UPDATED WITH ADDITIONAL STEEL MEMBERS AND CONNECTIONS, CONTRARY TO THE STOP WORK ORDER ISSUED ON 08/06/2026 UNDER COMPLAINT NO. 3A748

Cited provision(s): 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER

How this type of condition is typically resolved

An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.

Hearing issues to verify

  • What exact work was covered by the Stop Work Order: all work or only part of the project?
  • Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
  • Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?

Evidence that may matter

  • Copy of the Stop Work Order and any rescission/modification notice
  • DOB permit records and inspector correspondence
  • Daily logs, photographs and contractor records showing when work stopped or resumed
  • Evidence identifying any limited corrective/safety work performed

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.