BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3169077

Brooklyn property record with 6 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 14, 2026, October 16, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBrooklyn
BIN3169077
Block / Lot06459 / 0016
October Records6
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 035725901N (source ECB number 35725901N). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39199054J
ACTIVE
October 14, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. FOR WORK WITHOUT A PERMIT FOR VIO#357259902P . NO PERMIT ON FILE AS OF 8/4/2026., COMPLY WITH COMMISSIONER'S ORDER 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
39199047L
ACTIVE
October 14, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. FOR WORK WITHOUT A PERMIT FOR VIO#35725900L NO PERMIT ON FILE AS OF 8/4/2026., COMPLY WITH COMMISSIONER'S ORDER 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
39199051Y
ACTIVE
October 14, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. FOR WORK WITHOUT A PERMIT FOR VIO#35725901N .NO PERMIT ON FILE AS OF 8/4/2026., COMPLY WITH COMMISSIONER'S ORDER 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
35725900L
ACTIVE
October 16, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 ELECTRICAL WORK WITHOUT A PERMIT. ILLEGAL WORK NOTED: AT CELLAR AND 1ST FLOOR LEVEL(DUPLEX) INSTALLED WIRING FOR LIGHTING, SWITCHES, OUTLETSFOR TWO(2) STORY VERTICAL EXTENSION AJACENT ADJOINING BUILDING AT LOT 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
35725901N
ACTIVE
October 16, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 WORK WITHOUT A PERMIT. WORK NOTED: ERECTED A VERTICAL EXTENSION FROM TO TWO(2) STORIES, ROOF DECK WITH ROOF STRUCTURE-CONSISTING OF INTERNALFULL HEIGHT PARTITION WALLS TO CREATE-2 BEDROOMS, 3 PIECE BATHROOM, KI 101 — 28-105.1 WORK WITHOUT A PERMIT
35725902P
ACTIVE
October 16, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 WORK WITHOUT A PERMIT. WORK NOTED: AT CELLAR 1 GROUND FLOOR LEVELS(DUPLEX) INSTALLED WASTE AND WATER LINES FOR 3 PIECE BATHROOM, (LAVATORY SINK, WATER CLOSET, SHOWER); KITCHEN SINK, ILLEGAL GAS HOOK UP FOR GAS 101 — 28-105.1 WORK WITHOUT A PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 6 summons records for this property identifier. The charge mix is: 6 Work Without a Permit summonses. The hearing dates are October 14, 2026, October 16, 2026; the source issue date(s) are August 4, 2026, December 31, 2025.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39199054J

CLASS - 1 · Issued August 4, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. FOR WORK WITHOUT A PERMIT FOR VIO#357259902P . NO PERMIT ON FILE AS OF 8/4/2026., COMPLY WITH COMMISSIONER'S ORDER

Cited provision(s): 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39199047L

CLASS - 1 · Issued August 4, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. FOR WORK WITHOUT A PERMIT FOR VIO#35725900L NO PERMIT ON FILE AS OF 8/4/2026., COMPLY WITH COMMISSIONER'S ORDER

Cited provision(s): 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39199051Y

CLASS - 1 · Issued August 4, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. FOR WORK WITHOUT A PERMIT FOR VIO#35725901N .NO PERMIT ON FILE AS OF 8/4/2026., COMPLY WITH COMMISSIONER'S ORDER

Cited provision(s): 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 35725900L

CLASS - 1 · Issued December 31, 2025; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ELECTRICAL WORK WITHOUT A PERMIT. ILLEGAL WORK NOTED: AT CELLAR AND 1ST FLOOR LEVEL(DUPLEX) INSTALLED WIRING FOR LIGHTING, SWITCHES, OUTLETSFOR TWO(2) STORY VERTICAL EXTENSION AJACENT ADJOINING BUILDING AT LOT

Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 35725901N

CLASS - 1 · Issued December 31, 2025; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. WORK NOTED: ERECTED A VERTICAL EXTENSION FROM TO TWO(2) STORIES, ROOF DECK WITH ROOF STRUCTURE-CONSISTING OF INTERNALFULL HEIGHT PARTITION WALLS TO CREATE-2 BEDROOMS, 3 PIECE BATHROOM, KI

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 35725902P

CLASS - 1 · Issued December 31, 2025; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. WORK NOTED: AT CELLAR 1 GROUND FLOOR LEVELS(DUPLEX) INSTALLED WASTE AND WATER LINES FOR 3 PIECE BATHROOM, (LAVATORY SINK, WATER CLOSET, SHOWER); KITCHEN SINK, ILLEGAL GAS HOOK UP FOR GAS

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 6 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.