What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: 2 Site Safety / Safeguarding summonses. The hearing date is October 13, 2026; the source issue date(s) are January 8, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Site Safety / Safeguarding — Summons 35726387Y
CLASS - 1 · Issued January 8, 2026; hearing October 13, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO INSTITURE/MAINTAIN SAFETY EQUIP OR TEMPORARY CONTRACTING "NO TOE BOARD". AS NOTED; AT TIME OF INSPECTION AT AN ACTIVE JOBSITE FORA PROPOSED 3 STORY BUILDING ALREADY AT THE 2ND FLOOR LEVEL. OBSERVED A
Cited provision(s): 118 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OT TEMPORARY
How this type of condition is typically resolved
These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.
Hearing issues to verify
- What precise safety measure does the summons say was missing or inadequate?
- Was the condition temporary and corrected before or during the inspection?
- Did an approved site-safety plan or required site document address the cited condition?
Evidence that may matter
- Site Safety Plan / logistics drawings
- Daily safety logs and competent-person/site-safety records
- Photographs taken around the inspection time
- Contractor or safety-manager statements and correction records
Site Safety / Safeguarding — Summons 35726388X
CLASS - 1 · Issued January 8, 2026; hearing October 13, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIP MEASURE/TEMPORARY CONSTRUCTION "NO HANDRAIL". AS NOTED: AT TIME OF INSPECTION AT ON ACTIVE JOBSITE FOR A PROPOSED 3 STORY BUILDING ALREADY AT THE 2ND FLOOR LEVEL. OBSE
Cited provision(s): 120 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
How this type of condition is typically resolved
These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.
Hearing issues to verify
- What precise safety measure does the summons say was missing or inadequate?
- Was the condition temporary and corrected before or during the inspection?
- Did an approved site-safety plan or required site document address the cited condition?
Evidence that may matter
- Site Safety Plan / logistics drawings
- Daily safety logs and competent-person/site-safety records
- Photographs taken around the inspection time
- Contractor or safety-manager statements and correction records
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review