BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3173658

Brooklyn property record with 6 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 7, 2026, October 14, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Other Building / Code Compliance

BoroughBrooklyn
BIN3173658
Block / Lot06585 / 0032
October Records6
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039557414L (source ECB number 39557414L). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557414L
ACTIVE
October 7, 2026
9:30 AM
CLASS - 1 PENDING $10,000.00 A WORKER TRANSPORTED TO THE HOSPITAL AFTER SUSTAINING A LACERATION TO THE HAND WHILE USING A SKIL SAW. PERMIT HOLDER, JOB NO.B01363906-I1-GC, FAILED TO SUBMIT REPORT WITHIN 3 BUSINESS DAYS OF REQUIRED 16 ITEMS 1M7
39196683Z
ACTIVE
October 14, 2026
10:30 AM
CLASS - 1 PENDING $12,500.00 NOTED ELECTRIC WORK PREFORMED NOT BY A QUALIFED ELECTRICIAN WITH ELECTRIC PANELS OPEN/EXPOSED TO WORKERS, WIRES NOT PROPERLY GROUNDED, AND ELECTRIC CONNECTIONS EXPOSED, AND UNSAFE. WORK CREATED A DANGER OF FIRE 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
39196686Y
ACTIVE
October 14, 2026
10:30 AM
CLASS - 1 PENDING $12,500.00 NOTED WORK TO EXPAND CELLAR UNDER NEW BUILDING HORIZONTAL EXTENTION AT REAR. WORK WAS DONE WITHOUT PERMIT. SOE PERMIT B01363906-S1 TO ADD CELLAR EXTENTION TO EXISTING APPROVED ALTERARION B01363906 WAS OBJECTED 101 — 28-105.1 WORK WITHOUT A PERMIT
39196682R
ACTIVE
October 14, 2026
9:30 AM
CLASS - 1 PENDING $12,500.00 NOTED JOBSITE FOR VERTICAL AND HORIZONTAL ENLARGENT HAD LARGE AMOUNTS OF DEBRIS AT EXTERIOR ND IN JOBSITE MAKING AREA UNSAFE. DEBRIS BLOCKS SHARED DRIVE AND IS LEANING AGAINST PROPERTY ON EXP 4 SIDE. PILED DEBR 1N5
39196684K
ACTIVE
October 14, 2026
9:30 AM
CLASS - 1 PENDING $12,500.00 NOTED 8 WORKERS PREFORMING FRAMING PLUMBING, AND GENERAL CONSTRUCTION. UPON REQUEST NO PLANS WERE ON SITE TO VERIFY WORK BEING CONDUCTED. NOTED UNSAFE CONDITIONS THROUGHOUT SITE WERE 1 WORKERS WAS SEVERELY INJU 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
39196685M
ACTIVE
October 14, 2026
9:30 AM
CLASS - 1 PENDING $12,500.00 NOTED SKIL SAW THAT SERIOUSLY INJURED ON WORKER WAS BEING USED CONTRARY TO MANUFACTURES SPECS. WORKER FAILED TO SECURE ITEM BEING CUT, WORE LOOSE FITTING MATERIAL (FABIRC NOTED LODGED IN BLADE), AND CUT ITEM IN 1N4

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 6 summons records for this property identifier. The charge mix is: 3 Other Building / Code Compliance summonses; 2 Work Without a Permit summonses; Site Safety / Safeguarding. The hearing dates are October 14, 2026, October 7, 2026; the source issue date(s) are August 3, 2026, July 19, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Other Building / Code Compliance — Summons 39557414L

CLASS - 1 · Issued August 3, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: A WORKER TRANSPORTED TO THE HOSPITAL AFTER SUSTAINING A LACERATION TO THE HAND WHILE USING A SKIL SAW. PERMIT HOLDER, JOB NO.B01363906-I1-GC, FAILED TO SUBMIT REPORT WITHIN 3 BUSINESS DAYS OF REQUIRED 16 ITEMS

Cited provision(s): 1M7

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Work Without a Permit — Summons 39196683Z

CLASS - 1 · Issued July 19, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: NOTED ELECTRIC WORK PREFORMED NOT BY A QUALIFED ELECTRICIAN WITH ELECTRIC PANELS OPEN/EXPOSED TO WORKERS, WIRES NOT PROPERLY GROUNDED, AND ELECTRIC CONNECTIONS EXPOSED, AND UNSAFE. WORK CREATED A DANGER OF FIRE

Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39196686Y

CLASS - 1 · Issued July 19, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: NOTED WORK TO EXPAND CELLAR UNDER NEW BUILDING HORIZONTAL EXTENTION AT REAR. WORK WAS DONE WITHOUT PERMIT. SOE PERMIT B01363906-S1 TO ADD CELLAR EXTENTION TO EXISTING APPROVED ALTERARION B01363906 WAS OBJECTED

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Other Building / Code Compliance — Summons 39196682R

CLASS - 1 · Issued July 19, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: NOTED JOBSITE FOR VERTICAL AND HORIZONTAL ENLARGENT HAD LARGE AMOUNTS OF DEBRIS AT EXTERIOR ND IN JOBSITE MAKING AREA UNSAFE. DEBRIS BLOCKS SHARED DRIVE AND IS LEANING AGAINST PROPERTY ON EXP 4 SIDE. PILED DEBR

Cited provision(s): 1N5

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Site Safety / Safeguarding — Summons 39196684K

CLASS - 1 · Issued July 19, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: NOTED 8 WORKERS PREFORMING FRAMING PLUMBING, AND GENERAL CONSTRUCTION. UPON REQUEST NO PLANS WERE ON SITE TO VERIFY WORK BEING CONDUCTED. NOTED UNSAFE CONDITIONS THROUGHOUT SITE WERE 1 WORKERS WAS SEVERELY INJU

Cited provision(s): 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Other Building / Code Compliance — Summons 39196685M

CLASS - 1 · Issued July 19, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: NOTED SKIL SAW THAT SERIOUSLY INJURED ON WORKER WAS BEING USED CONTRARY TO MANUFACTURES SPECS. WORKER FAILED TO SECURE ITEM BEING CUT, WORE LOOSE FITTING MATERIAL (FABIRC NOTED LODGED IN BLADE), AND CUT ITEM IN

Cited provision(s): 1N4

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Case-specific next step

For this property, the first paid review should reconcile the 6 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.