October 2026 NYC DOB / OATH Hearing — BIN 3177779

Brooklyn property record with 4 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 14, 2026, October 28, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBrooklyn
BIN3177779
Block / Lot06669 / 0035
October Records4
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039198268K (source ECB number 39198268K). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39198635N
ACTIVE
October 14, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 ATOI OBSERVED AN UNPERMITTED ALUMINUM-FRAMED AWNING INSTALLED ALONG THE SIDE YARD AND AN ALUMINUM/GLASS ENCLOSURE CONSTRUCTED OVER THE LOWER-LEVEL STAIRWELL WITH BOTH STRUCTURES PERMANENTLY AFFIXED TO THE FACAD 201 — 28-105.1 WORK WITHOUT A PERMIT
39198268K
ACTIVE
October 14, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 ELECTRICAL WORK WITHOUT PERMIT. NOTED: AT A 3-STORY WALK UP OBSERVED INSTALLATION OF ELECTRICAL WIRING FOR 10 SPLIT SYSTEM AIR CONDITIONING UNITS, INCLUDING CONNECTIONS TO DEDICATED CIRCUITS AND INSTALLATION OF 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
39201541R
ACTIVE
October 28, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 ATOI OBSERVED AN UNPERMITTED REAR-YARD ACCESSORY STRUCTURE. STRUCTURE APPEARS TO BE WOOD FRAMED WITH SCREENED WALLS AND HIPPED TRANSLUCENT CORRUGATED ROOF PANELS, APPROX. 8 HIGH AND 18 FEET WIDE BY 14 FEET DEEP 201 — 28-105.1 WORK WITHOUT A PERMIT
39201540P
ACTIVE
October 28, 2026
9:30 AM
CLASS - 3 PENDING $500.00 ATOI OBSERVED A ONE-STORY HIGH COMBUSTIBLE PLASTIC SHED IN REAR AND SIDE YARD OF PROPERTY. STRUCTURE IS APPROX 7FT HIGH AND 8FT WIDE AND IN CLOSE PROXIMITY TO NEIGHBORING PROPERTY LINE. STRUCTURE IS LESS THAN 3 384 — ZR-MISC MISCELLANEOUS VIOLATIONS OF THE ZONING RESOLUTION

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; Zoning / Parking / Use. The hearing dates are October 14, 2026, October 28, 2026; the source issue date(s) are August 24, 2026, July 29, 2026, July 31, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39198635N

CLASS - 2 · Issued July 31, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED AN UNPERMITTED ALUMINUM-FRAMED AWNING INSTALLED ALONG THE SIDE YARD AND AN ALUMINUM/GLASS ENCLOSURE CONSTRUCTED OVER THE LOWER-LEVEL STAIRWELL WITH BOTH STRUCTURES PERMANENTLY AFFIXED TO THE FACAD

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39198268K

CLASS - 2 · Issued July 29, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ELECTRICAL WORK WITHOUT PERMIT. NOTED: AT A 3-STORY WALK UP OBSERVED INSTALLATION OF ELECTRICAL WIRING FOR 10 SPLIT SYSTEM AIR CONDITIONING UNITS, INCLUDING CONNECTIONS TO DEDICATED CIRCUITS AND INSTALLATION OF

Cited provision(s): 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39201541R

CLASS - 2 · Issued August 24, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED AN UNPERMITTED REAR-YARD ACCESSORY STRUCTURE. STRUCTURE APPEARS TO BE WOOD FRAMED WITH SCREENED WALLS AND HIPPED TRANSLUCENT CORRUGATED ROOF PANELS, APPROX. 8 HIGH AND 18 FEET WIDE BY 14 FEET DEEP

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Zoning / Parking / Use — Summons 39201540P

CLASS - 3 · Issued August 24, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED A ONE-STORY HIGH COMBUSTIBLE PLASTIC SHED IN REAR AND SIDE YARD OF PROPERTY. STRUCTURE IS APPROX 7FT HIGH AND 8FT WIDE AND IN CLOSE PROXIMITY TO NEIGHBORING PROPERTY LINE. STRUCTURE IS LESS THAN 3

Cited provision(s): 384 — ZR-MISC MISCELLANEOUS VIOLATIONS OF THE ZONING RESOLUTION

How this type of condition is typically resolved

Zoning charges require comparing the observed use, parking arrangement or physical condition to the applicable zoning district, lawful occupancy and any prior approvals or variances. Correction can mean stopping the use, restoring required parking, or pursuing a lawful approval if available.

Hearing issues to verify

  • Is the cited zoning district/use classification correct for this lot?
  • Was the alleged use actually occurring on the issue date?
  • Is there a prior BSA/CPC/DOB approval, variance or grandfathered condition relevant to the charge?

Evidence that may matter

  • Zoning map and ZOLA/property records
  • Certificate of Occupancy / approved plans
  • Survey or parking layout
  • Prior approvals, variances, permits and dated photographs

Case-specific next step

For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.