October 2026 NYC DOB / OATH Hearing — BIN 3191941

Brooklyn property record with 2 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 21, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Crane / Hoist / Derricks

BoroughBrooklyn
BIN3191941
Block / Lot07108 / 0011
October Records2
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039199894M (source ECB number 39199894M). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39199894M
ACTIVE
October 21, 2026
10:30 AM
CLASS - 1 PENDING $10,000.00 KNUCKLE BOOM (FASSI SN#38050028) USED BY BUILDERS JOSEPEH AND SONS, GC-617198 WAS SET UP UNSAFELY ON SITE. OUTRIGGERS WERE SET ON EDGE OF CONCRETE FOUNDATION WITH SIGNS OF CRACKING APPARENT & HALFWAY OFF DUNNAG 142 — BC 3316.2 & BC 3319.1 INADEQUATE SAFETY MEASURES: OPERATION OF CRANE/ DERRICK/HOISTING EQUIP
39199861X
ACTIVE
October 21, 2026
8:30 AM
CLASS - 1 PENDING $10,000.00 KNUCKLE BOOM (FASSI SN#38050028) OWNED BY CMC STUDS & STEEL LIFTING SERVICES WAS SET UP UNSAFELY ON SITE. OUTRIGGERS WERE SET ON EDGE OF CONCRETE FOUNDATION WALL WITH SIGN OF CRACKING APPARENT & HALF WAY OFF DU 142 — BC 3316.2 & BC 3319.1 INADEQUATE SAFETY MEASURES: OPERATION OF CRANE/ DERRICK/HOISTING EQUIP

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Crane / Hoist / Derricks; Sign / Awning / Advertising. The hearing date is October 21, 2026; the source issue date(s) are August 10, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Crane / Hoist / Derricks — Summons 39199894M

CLASS - 1 · Issued August 10, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: KNUCKLE BOOM (FASSI SN#38050028) USED BY BUILDERS JOSEPEH AND SONS, GC-617198 WAS SET UP UNSAFELY ON SITE. OUTRIGGERS WERE SET ON EDGE OF CONCRETE FOUNDATION WITH SIGNS OF CRACKING APPARENT & HALFWAY OFF DUNNAG

Cited provision(s): 142 — BC 3316.2 & BC 3319.1 INADEQUATE SAFETY MEASURES: OPERATION OF CRANE/ DERRICK/HOISTING EQUIP

How this type of condition is typically resolved

Crane/hoist matters are specialized safety and licensing cases. Resolution generally requires the correct equipment permit/notification, licensed operator/equipment records, inspections and compliance with site-specific lifting/safety requirements.

Hearing issues to verify

  • Did the cited equipment and activity require the permit/notification alleged?
  • Was the operator/equipment authorization current on the inspection date?
  • Do logs and inspection records contradict the unsafe condition described?

Evidence that may matter

  • Equipment permit / CD filing
  • Operator license and equipment certification
  • Inspection / maintenance / lift-plan records
  • Dated site photographs and safety logs

Sign / Awning / Advertising — Summons 39199861X

CLASS - 1 · Issued August 10, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: KNUCKLE BOOM (FASSI SN#38050028) OWNED BY CMC STUDS & STEEL LIFTING SERVICES WAS SET UP UNSAFELY ON SITE. OUTRIGGERS WERE SET ON EDGE OF CONCRETE FOUNDATION WALL WITH SIGN OF CRACKING APPARENT & HALF WAY OFF DU

Cited provision(s): 142 — BC 3316.2 & BC 3319.1 INADEQUATE SAFETY MEASURES: OPERATION OF CRANE/ DERRICK/HOISTING EQUIP

How this type of condition is typically resolved

Sign-related charges usually require confirming zoning/permit requirements, dimensions, illumination and placement, followed by permit/legalization or removal/modification.

Hearing issues to verify

  • Was the sign/awning exempt from a permit or already covered by an approved filing?
  • Were the dimensions/location described by the inspector accurate?
  • Was the sign removed or modified before the summons date or hearing?

Evidence that may matter

  • Sign permit / zoning documents
  • Measured photographs and drawings
  • Removal or modification invoice
  • Prior approvals and storefront plans

Case-specific next step

For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.