October 2026 NYC DOB / OATH Hearing — BIN 3194490

Brooklyn property record with 4 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 9, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBrooklyn
BIN3194490
Block / Lot07174 / 0102
October Records4
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039152049R (source ECB number 39152049R). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39152048P
ACTIVE
October 9, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 WORK WITHOUT PERMIT FSWO ISSUED FOR ALL PLUMBING WORK BEING DONE ON THE RESIDENT. ATOI OBSERVED ON THE 1ST FLOOR NEWLY INSTALLED PLUMBING WORK BEING DONE FOR THE BATHROOM WORK IS 95% COMPLETED NO PERMITS WERE F 101 — 28-105.1 WORK WITHOUT A PERMIT
39152049R
ACTIVE
October 9, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 WORK WITHOUT PERMIT. FSWO ISSUED FOR ALL GENERAL CONSTRUCTION BEING DONE ON THE STORE AT THE STREET LEVEL CARPENTRY ECT. ATOI OBSERVED ON THE 1ST FLOOR INTERIOR NEWLY INSTALLED SHEETROCK WALLS AND CEILINGS NO P 101 — 28-105.1 WORK WITHOUT A PERMIT
39152050Y
ACTIVE
October 9, 2026
8:30 AM
CLASS - 1 PENDING $1,600.00 WORK WITHOUT PERMIT: FSWO ISSUED FOR ALL ELECTRICAL WORK BEING DONE ON THE STORE AT STREET LEVEL. ATOI OBSERVED AT 8:00 AM ON THE 1ST FLOOR AND BASEMENT NEWLY INSTALLED ELECTRICAL WIRING APPROX 40 ELECTRICAL LI 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
39152051X
ACTIVE
October 9, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 NOTED: VIOLATION ISSUED: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENT . ATOI OBSERVED AT EXPO # 3 EXCESSIVE STORED CONSTRUCTION DEBRIS CONSISTING OF PILES OF WOOD ,CARDBOARD,BOXES AND MULTI 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; Failure to Maintain. The hearing date is October 9, 2026; the source issue date(s) are June 26, 2025.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39152048P

CLASS - 1 · Issued June 26, 2025; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT PERMIT FSWO ISSUED FOR ALL PLUMBING WORK BEING DONE ON THE RESIDENT. ATOI OBSERVED ON THE 1ST FLOOR NEWLY INSTALLED PLUMBING WORK BEING DONE FOR THE BATHROOM WORK IS 95% COMPLETED NO PERMITS WERE F

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39152049R

CLASS - 1 · Issued June 26, 2025; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT PERMIT. FSWO ISSUED FOR ALL GENERAL CONSTRUCTION BEING DONE ON THE STORE AT THE STREET LEVEL CARPENTRY ECT. ATOI OBSERVED ON THE 1ST FLOOR INTERIOR NEWLY INSTALLED SHEETROCK WALLS AND CEILINGS NO P

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39152050Y

CLASS - 1 · Issued June 26, 2025; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT PERMIT: FSWO ISSUED FOR ALL ELECTRICAL WORK BEING DONE ON THE STORE AT STREET LEVEL. ATOI OBSERVED AT 8:00 AM ON THE 1ST FLOOR AND BASEMENT NEWLY INSTALLED ELECTRICAL WIRING APPROX 40 ELECTRICAL LI

Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Failure to Maintain — Summons 39152051X

CLASS - 1 · Issued June 26, 2025; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: NOTED: VIOLATION ISSUED: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENT . ATOI OBSERVED AT EXPO # 3 EXCESSIVE STORED CONSTRUCTION DEBRIS CONSISTING OF PILES OF WOOD ,CARDBOARD,BOXES AND MULTI

Cited provision(s): 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Case-specific next step

For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.