What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: 2 Stop Work Order summonses. The hearing dates are October 15, 2026, October 8, 2026; the source issue date(s) are August 23, 2025, August 6, 2025.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Stop Work Order — Summons 39158171H
CLASS - 1 · Issued August 23, 2025; hearing October 8, 2026. · Hearing status: PENDING
DOB allegation in the source extract: BUILDING VIOLATION ISSUED FOR FAILURE TO OBEY STOP WORK ORDER DUE TO 3 WORKERS PERFORMING CONCRETE OPERATIONS AT EXPOSURES 1 AND 4 OF STRUCTURE. FULL STOP WORK ORDER ISSUED ON 02/25/2025, COMPLY WITH COMMISSION
Cited provision(s): 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
How this type of condition is typically resolved
An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.
Hearing issues to verify
- What exact work was covered by the Stop Work Order: all work or only part of the project?
- Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
- Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?
Evidence that may matter
- Copy of the Stop Work Order and any rescission/modification notice
- DOB permit records and inspector correspondence
- Daily logs, photographs and contractor records showing when work stopped or resumed
- Evidence identifying any limited corrective/safety work performed
Stop Work Order — Summons 39156253M
CLASS - 1 · Issued August 6, 2025; hearing October 15, 2026. · Hearing status: DEFAULT
DOB allegation in the source extract: UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. FULL STOP WORK ORDER ISSUED 1/24/25 UNDER COMPLAINT # 3986149. UNLAWFUL WORK NOTED; AT RIGHT SIDE OF PREMISES OBSERVED WORKER LAYING BRICKS TO EXT
Cited provision(s): 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
How this type of condition is typically resolved
An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.
Hearing issues to verify
- What exact work was covered by the Stop Work Order: all work or only part of the project?
- Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
- Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?
Evidence that may matter
- Copy of the Stop Work Order and any rescission/modification notice
- DOB permit records and inspector correspondence
- Daily logs, photographs and contractor records showing when work stopped or resumed
- Evidence identifying any limited corrective/safety work performed
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.