October 2026 NYC DOB / OATH Hearing — BIN 3196994

Brooklyn property record with 5 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 28, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBrooklyn
BIN3196994
Block / Lot07297 / 0051
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039201492J (source ECB number 39201492J). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39201493L
ACTIVE
October 28, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 WORK WITHOUT PERMIT. PSWO ISSUED FOR ALL PLUMBING WORK BEING DONE .ATOI OBSERVED IN THE INTERIOR OF THE RESIDENT ON THE 1ST AND 2ND FLOOR NEWLY INSTALLED PLUMBING WORK IN THE KITCHEN AND BATHROOMS CONSISTING OF 101 — 28-105.1 WORK WITHOUT A PERMIT
39201491H
ACTIVE
October 28, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 VIOLATION ISSUED FOR FAILURE TO MAINTAIN SAFETY MEASURES NO HANDRAIL SYSTEM AND GUARDRAIL SYSTEM . ATOI OBSERVED IN THE INTERIOR OF THE RESIDENT NO GUARDRAIL AND HANDRAIL SYSTEM FROM THE BASEMENT TO THE SECOND 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39201494N
ACTIVE
October 28, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 WORK WITHOUT PERMIT. PSWO ISSUED FOR ALL ELECTRICAL WORK BEING DONE ON THE INTERIOR OF THE RESIDENT. ATOI OBSERVED AT 8 AM IN THE INTERIOR FROM THE BASEMENT TO THE 2ND FLOOR ACTIVE ELECTRICAL WORK CONSISTING OF 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
39201492J
ACTIVE
October 28, 2026
9:30 AM
CLASS - 1 PENDING $5,000.00 WORK WITHOUT PERMIT PSWO ISSUED FOR DEMOLITION WORK WITHOUT REQUIRED DEMOLITION PERMIT. ATOI OBSERVED AT EXPO # 3 RESIDENTS GARAGE HAS BEEN DEMOLISHED. NO PERMITS WERE FOUND FOR THE SCOPE OF WORK., OBTAIN REQUI 121 — 28-105.1 DEMOLITION WORK WITHOUT REQUIRED DEMOLITION PERMIT
39201495P
ACTIVE
October 28, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 NOTED: ECB VIOLATION ISSUED FOR FTM DUE TO EXCESSIVE DEBRIS. ATOI OBSERVED AN EXCESSIVE AMOUNT OF CONSTRUCTION DEBRIS PILED UP AT EXPO # 3 . CONSISTING OF LARGE PILES OF CUT UP WOOD AND A 4 FOOT HIGH PILED OF C 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; 2 Failure to Maintain summonses. The hearing date is October 28, 2026; the source issue date(s) are August 24, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39201493L

CLASS - 1 · Issued August 24, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT PERMIT. PSWO ISSUED FOR ALL PLUMBING WORK BEING DONE .ATOI OBSERVED IN THE INTERIOR OF THE RESIDENT ON THE 1ST AND 2ND FLOOR NEWLY INSTALLED PLUMBING WORK IN THE KITCHEN AND BATHROOMS CONSISTING OF

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Failure to Maintain — Summons 39201491H

CLASS - 1 · Issued August 24, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: VIOLATION ISSUED FOR FAILURE TO MAINTAIN SAFETY MEASURES NO HANDRAIL SYSTEM AND GUARDRAIL SYSTEM . ATOI OBSERVED IN THE INTERIOR OF THE RESIDENT NO GUARDRAIL AND HANDRAIL SYSTEM FROM THE BASEMENT TO THE SECOND

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Work Without a Permit — Summons 39201494N

CLASS - 1 · Issued August 24, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT PERMIT. PSWO ISSUED FOR ALL ELECTRICAL WORK BEING DONE ON THE INTERIOR OF THE RESIDENT. ATOI OBSERVED AT 8 AM IN THE INTERIOR FROM THE BASEMENT TO THE 2ND FLOOR ACTIVE ELECTRICAL WORK CONSISTING OF

Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39201492J

CLASS - 1 · Issued August 24, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT PERMIT PSWO ISSUED FOR DEMOLITION WORK WITHOUT REQUIRED DEMOLITION PERMIT. ATOI OBSERVED AT EXPO # 3 RESIDENTS GARAGE HAS BEEN DEMOLISHED. NO PERMITS WERE FOUND FOR THE SCOPE OF WORK., OBTAIN REQUI

Cited provision(s): 121 — 28-105.1 DEMOLITION WORK WITHOUT REQUIRED DEMOLITION PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Failure to Maintain — Summons 39201495P

CLASS - 1 · Issued August 24, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: NOTED: ECB VIOLATION ISSUED FOR FTM DUE TO EXCESSIVE DEBRIS. ATOI OBSERVED AN EXCESSIVE AMOUNT OF CONSTRUCTION DEBRIS PILED UP AT EXPO # 3 . CONSISTING OF LARGE PILES OF CUT UP WOOD AND A 4 FOOT HIGH PILED OF C

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.