October 2026 NYC DOB / OATH Hearing — BIN 3198304

Brooklyn property record with 7 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 21, 2026, October 27, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBrooklyn
BIN3198304
Block / Lot07325 / 0011
October Records7
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039172253M (source ECB number 39172253M). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39199314R
ACTIVE
October 21, 2026
10:30 AM
CLASS - 1 PENDING $10,000.00 ATOI OBSERVED WORK HAS CONTINUED WHILE ON NOTICE OF SWO ISSUED ON 01/2/2026 SUMMONS # 39172226R THERE ARE NO ACTIVE PERMITS TO VERIFY ANY OF THE QUESTIONABLE CONSTRUCTION WORK. OBSERVED WORKERS WORKING ON THE E 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
39199313P
ACTIVE
October 21, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 NOTED: ECB VIOLATION ISSUED FOR OBSERVED EXPIRED CONSTRUCTION FENCE PERMIT POSTED ON THE CONSTRUCTION FENCE. WHILE ACTIVE CONSTRUCTION WAS ON GOING FENCE PERMIT # B013125020-I1 EXPIRED 5/24/26, RENEW PERMIT 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT
39172224N
ACTIVE
October 27, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 OBSERVED UNPERMITTED 1 STORY HORIZONTAL EXTENSION AT EXP 3. EXTENSION IS APPROX 21'D X 30'W X 10'H. NEW FOUNDATION WAS CREATED FOR EXTENSION. ALSO OBSERVED INTERIOR OF FIRST FLOOR WAS DEMOED TO THE FRAMING. WOR 101 — 28-105.1 WORK WITHOUT A PERMIT
39172225P
ACTIVE
October 27, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO PROTECT PUBLIC AND PROPERTY FROM CONSTRUCTION OPERATIONS. NEIGHBOR YARD AT EXP 2 HAS CONST DEBRIS AND FENCE WAS REMOVED. AT EXP 3 NEIGHBOR PARKING AT REAR IS EXPOSED TO POTENTIAL FALLING CONST MATERI 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39172226R
ACTIVE
October 27, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 OBSERVED AN UNPERMITTED REAR EXTENSION AT EXP 3 CREATING A HOUSE THAT NO LONGER CONFORMS TO DEPT RECORDS. RECORDS SHOW HOUSE IS 61' DEEP AND 21' WIDE. EXTENSTION CREATES A HOUSE APPROX 85' DEEP AND 35'W AT THE 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
39172227Z
ACTIVE
October 27, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 OBSERVED LARGE PILE OF COPNSTRUCTION DEBRIS AT EXP 2 AT REAR YARD EXTENSION. DEBRIS CONSISTING OF COMBUSTIBLE WOOD SCRAPS, ROOFING MATLS, BLACK BAGS, INSULATION ETC. APPROX 10 YDS., REPAIR AND/REPLACE 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39172253M
ACTIVE
October 27, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 OBSVD CONST FENCE AS BUILT DOES NOT CONFORM TO APPRVD PLANS. PLANS SHOW FENCE AT EXP 1 WITH 2 GATES. THEN EXTENDING ON BOTH SIDES (EXP2 AND 4)TO THE REAR YARD EXP 3. THEN ACROSS THE YARD FROM EXP 2 TO 4. FENCE 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 7 summons records for this property identifier. The charge mix is: 2 Work Without a Permit summonses; 2 Failure to Maintain summonses; Stop Work Order; Construction Fence; Illegal Occupancy / Conversion. The hearing dates are October 21, 2026, October 27, 2026; the source issue date(s) are August 5, 2026, January 2, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Stop Work Order — Summons 39199314R

CLASS - 1 · Issued August 5, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED WORK HAS CONTINUED WHILE ON NOTICE OF SWO ISSUED ON 01/2/2026 SUMMONS # 39172226R THERE ARE NO ACTIVE PERMITS TO VERIFY ANY OF THE QUESTIONABLE CONSTRUCTION WORK. OBSERVED WORKERS WORKING ON THE E

Cited provision(s): 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

How this type of condition is typically resolved

An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.

Hearing issues to verify

  • What exact work was covered by the Stop Work Order: all work or only part of the project?
  • Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
  • Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?

Evidence that may matter

  • Copy of the Stop Work Order and any rescission/modification notice
  • DOB permit records and inspector correspondence
  • Daily logs, photographs and contractor records showing when work stopped or resumed
  • Evidence identifying any limited corrective/safety work performed

Construction Fence — Summons 39199313P

CLASS - 2 · Issued August 5, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: NOTED: ECB VIOLATION ISSUED FOR OBSERVED EXPIRED CONSTRUCTION FENCE PERMIT POSTED ON THE CONSTRUCTION FENCE. WHILE ACTIVE CONSTRUCTION WAS ON GOING FENCE PERMIT # B013125020-I1 EXPIRED 5/24/26, RENEW PERMIT

Cited provision(s): 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT

How this type of condition is typically resolved

Construction-fence charges generally require bringing the fence, gates, viewing panels, height and site protection into compliance with the approved construction-safety setup and maintaining it for the required duration.

Hearing issues to verify

  • Did the fence configuration on the inspection date match the approved/logistics plan?
  • Was the cited opening or defect temporary and promptly corrected?
  • Was a permit or construction-fence filing active where required?

Evidence that may matter

  • Approved construction-fence/site logistics documents
  • Dated photographs
  • Contractor logs and correction invoice
  • Permit/filing record

Work Without a Permit — Summons 39172224N

CLASS - 1 · Issued January 2, 2026; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED UNPERMITTED 1 STORY HORIZONTAL EXTENSION AT EXP 3. EXTENSION IS APPROX 21'D X 30'W X 10'H. NEW FOUNDATION WAS CREATED FOR EXTENSION. ALSO OBSERVED INTERIOR OF FIRST FLOOR WAS DEMOED TO THE FRAMING. WOR

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Failure to Maintain — Summons 39172225P

CLASS - 1 · Issued January 2, 2026; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO PROTECT PUBLIC AND PROPERTY FROM CONSTRUCTION OPERATIONS. NEIGHBOR YARD AT EXP 2 HAS CONST DEBRIS AND FENCE WAS REMOVED. AT EXP 3 NEIGHBOR PARKING AT REAR IS EXPOSED TO POTENTIAL FALLING CONST MATERI

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Illegal Occupancy / Conversion — Summons 39172226R

CLASS - 1 · Issued January 2, 2026; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED AN UNPERMITTED REAR EXTENSION AT EXP 3 CREATING A HOUSE THAT NO LONGER CONFORMS TO DEPT RECORDS. RECORDS SHOW HOUSE IS 61' DEEP AND 21' WIDE. EXTENSTION CREATES A HOUSE APPROX 85' DEEP AND 35'W AT THE

Cited provision(s): 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Failure to Maintain — Summons 39172227Z

CLASS - 1 · Issued January 2, 2026; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED LARGE PILE OF COPNSTRUCTION DEBRIS AT EXP 2 AT REAR YARD EXTENSION. DEBRIS CONSISTING OF COMBUSTIBLE WOOD SCRAPS, ROOFING MATLS, BLACK BAGS, INSULATION ETC. APPROX 10 YDS., REPAIR AND/REPLACE

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Work Without a Permit — Summons 39172253M

CLASS - 1 · Issued January 2, 2026; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSVD CONST FENCE AS BUILT DOES NOT CONFORM TO APPRVD PLANS. PLANS SHOW FENCE AT EXP 1 WITH 2 GATES. THEN EXTENDING ON BOTH SIDES (EXP2 AND 4)TO THE REAR YARD EXP 3. THEN ACROSS THE YARD FROM EXP 2 TO 4. FENCE

Cited provision(s): 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 7 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.