BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3200851

Brooklyn property record with 4 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 7, 2026, October 28, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBrooklyn
BIN3200851
Block / Lot07377 / 0074
October Records4
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039188379Y (source ECB number 39188379Y). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39188379Y
ACTIVE
October 7, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 WORK WITHOUT PERMIT PSWO ISSUED FOR ALL GENERAL CONSTRUCTION. CARPENTRY MASONRY STRUCTURAL. ATOI OBSERVED AT EXPO# 3 A NEWLY BUILT CMU PORCH EXTENSION APOX 10 FT IN LENGTH AND 20FT IN WIDTH ATTACHED TO THE EXIS 101 — 28-105.1 WORK WITHOUT A PERMIT
39188380L
ACTIVE
October 7, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 NOTED: VIOLATION ISSUED FOR FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER DUE TO EXCESSIVE DEBRIS. ATOI OBSERVED AN EXCESSIVE AMOUNT OF CONSTRUCTION DEBRIS PILED UP AT EXPO # 3 OF THE RESIDENT . CONSIST 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39188381N
ACTIVE
October 7, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 VIOLATION ISSUED FOR FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. ATOI OBSERVED AT EXPO # 3 A NEWLY BUILT CMU PORCH WITH NO GUARD RAIL AND HAND RAIL SYSTEM. WHICH IS A FALL HAZARD FOR THE RESIDENT AND 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39200294Y
ACTIVE
October 28, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 ATOI OBSERVED CONDENSORS FEEDING MINI SPLIT UNITS ON EXPOSURE 2 OF HOUSE. NO ELECTRICAL PERMIT ON FILE. PER B2C4 CLASS 2 28-105.1 ELECTRICAL WORK WITHOUT A PERMIT, OBTAIN ALL PERMITS 201 — 28-105.1 WORK WITHOUT A PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 2 Work Without a Permit summonses; 2 Failure to Maintain summonses. The hearing dates are October 28, 2026, October 7, 2026; the source issue date(s) are August 12, 2026, May 13, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39188379Y

CLASS - 1 · Issued May 13, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT PERMIT PSWO ISSUED FOR ALL GENERAL CONSTRUCTION. CARPENTRY MASONRY STRUCTURAL. ATOI OBSERVED AT EXPO# 3 A NEWLY BUILT CMU PORCH EXTENSION APOX 10 FT IN LENGTH AND 20FT IN WIDTH ATTACHED TO THE EXIS

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Failure to Maintain — Summons 39188380L

CLASS - 1 · Issued May 13, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: NOTED: VIOLATION ISSUED FOR FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER DUE TO EXCESSIVE DEBRIS. ATOI OBSERVED AN EXCESSIVE AMOUNT OF CONSTRUCTION DEBRIS PILED UP AT EXPO # 3 OF THE RESIDENT . CONSIST

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Failure to Maintain — Summons 39188381N

CLASS - 1 · Issued May 13, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: VIOLATION ISSUED FOR FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. ATOI OBSERVED AT EXPO # 3 A NEWLY BUILT CMU PORCH WITH NO GUARD RAIL AND HAND RAIL SYSTEM. WHICH IS A FALL HAZARD FOR THE RESIDENT AND

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Work Without a Permit — Summons 39200294Y

CLASS - 2 · Issued August 12, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED CONDENSORS FEEDING MINI SPLIT UNITS ON EXPOSURE 2 OF HOUSE. NO ELECTRICAL PERMIT ON FILE. PER B2C4 CLASS 2 28-105.1 ELECTRICAL WORK WITHOUT A PERMIT, OBTAIN ALL PERMITS

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.